PROTECTED STRUCTURE: Permission is sought by Trinity College Dublin for the installation of 2 no. free-standing bicycle shelters at Trinity Hall, Dartry, Dublin 6. The subject property is a Protected Structure.
Planning precedent report
Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.Planning precedent report
Trinity Hall, Dartry, Dublin 6
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
12% of nearby decided applications were refused. The preview found 14,444 nearby planning records within 5 km where a location match is available.
- Matched source
- 3526/24
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
Open preview
Nearest similar decisions
The development will consist of the demolition of an existing single storey glasshouse and the construction of a new single storey glasshouse in place of the existing one and works to the existing garden path to provide part M compliant access to the new glasshouse.
PROTECTED STRUCTURE: planning permission for development to the Coach House at the rear of this site. The development will consist of: (1) the extension and alteration to the existing single storey south side return, (2) the provision of a new eternal west facing garden veranda, (3) replacement of existing non original windows and doors, (4) general internal alterations and repairs, (5) the provision of two new rooflights, (6) treatment and repair of facade finishes.
PROTECTED STRUCTURE: The development will consist of: (1) the replacement of all existing uPVC windows and doors, with traditional painted timber sash windows and doors, (2) Replacement of existing modern uPVC window and door frames to existing south facing conservatory with traditional steel frames, (3) removal of some modern internal partitions, and general internal alterations and repairs, (4) Extension to side return behind existing front (west) facing screen wall incorporating the existing side yard, including the provision of a new front facing door, two new windows, and two rooflights, (5) and the provision of an extension to the rear, including the provision of new windows and doors facing the rear garden, (6) the provision of a new external rear garden veranda. (7) and at basement level, the replacement of part of the existing concrete floor slab to a revised level, including the provision of a new door and windows to side elevation and the provision of pair of new French doors in lieu of an existing window to the rear elevation, (8) and the provision of a new sunken external patio area with external access stairs and glass balustrades to the side and rear.
The development will consists of the removal of an existing 16m high shrouded telecommunications support structure together with a floodlight and CCTV on it and replacement with a new 18.5m high shrouded telecommunications support structure with the relocated existing floodlight and CCTV on it, carrying telecommunications equipment including antennas, RRUs and dishes, together with associated exchange cabinets and all associated site development works. The development will provide for wireless data and broadband services.
RETENTION: The development consists of: Proposed extension of time to the temporary retention permission for previously approved reg.ref. 3264/21: Stretched Skin Structure, supported by steel columns, which accommodates silent fitness classes on the grounds of Dartry Health Club; Classes to take place Monday - Friday 7am - 8.15pm, Saturday 9am- 4pm, Sunday 10am - 1.20pm; and 3985/22 10ft Shipping container wrapped in artificial foliage to cater for gym classes; and all associated site and landscaping works
The full report covers all 14,444 decisions within 5km — with the planner's exact reasons, verbatim quotes and policy citations — delivered as a PDF. €49 incl. VAT.
Source match
Matched from public planning record 3526/24The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.
Included in full report
Policy and design risk
Included in full report
Source document extracts
Included in full report
Comparable decision table
Included in full report