Applications tied to the site
Partial coverage11 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
11 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
13% of nearby decided applications were refused. The site check found 13,120 decisions within 5 km, 11 exact-site or onsite candidate records, and 2982 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
11 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
11 matched1 of 2 layers are loaded for Dublin City Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedNo verified rural-housing citation is loaded for Dublin City Council, so this brief makes no current policy claim and relies on decision history.
2 of 4 layers are loaded for Dublin City Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
2982 structured nearby appeal records.
2,982 matchedCitations are current-dated and carry policy name, section, page and source URL from the Dublin City Council development plan.
1 matchedOpen preview
Open preview
The development will consist of the partial demolition to the front boundary wall and the creation of a new vehicular entrance, 3m wide and the provision of 1no. off street parking space and all associated site and landscaping works.
RETENTION: For a two storey metal clad extension to side of existing retail unit all with associated ancillary works
The development for permission will consist of: Construction of a first floor extension with a hipped roof over the existing garage to the side All associated ancillary, site and landscaping works. The development for retention permission consists of: Conversion and extension of the single storey garage to the side/rear with a new flat roof over including new windows/doors to the front and rear.
Planning permission is sought by Roisin Byrne and Rory Curtis at 95 Blarney Park, Dublin 12, D12 W2F8, for the: a) demolition of existing garage and sheds; b) construction of 30.5 sqm single storey, flat roofed extension to the side and rear of the existing house; c) provision of obscured glazed window at side elevation of first floor level; d) provision of 2 no rooflights to existing pitched roof; e) provision of pedestrian access gate; f) and associated site works.
PERMISSION:The development will consist of the following - The removal of the existing single storey extensions to the side and rear of number 44 Blarney Park and the provision of a new two storey domestic extension to the side with pitched roof and solar panels plus a new single storey rear extension and including all ancillary site and drainage works.
The development will consist of the construction of a single storey extension to rear and single storey extension to side of existing dwelling, re-positioning of front door and window, installation of roof lights to rear and side extension and all ancillary works.
The brief summarizes the pattern across all 13,120 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 3557/23The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief