Applications tied to the site
Partial coverage8 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
8 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
9% of nearby decided applications were refused. The site check found 6,667 decisions within 5 km, 8 exact-site or onsite candidate records, and 743 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
8 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
8 matched1 of 2 layers are loaded for Dublin City Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedNo verified rural-housing citation is loaded for Dublin City Council, so this brief makes no current policy claim and relies on decision history.
2 of 4 layers are loaded for Dublin City Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
743 structured nearby appeal records.
743 matchedCitations are current-dated and carry policy name, section, page and source URL from the Dublin City Council development plan.
1 matchedOpen preview
Open preview
Planning permission to widen pedestrian entrance to create a new vehicular entrance with kerb dishing to facilitate off street parking and EV charging for one car.
For the construction of 1) an extension at first floor level to the side of the existing dwelling, and 2) the extension of the roof structure to the side to also include a dormer window to the side and a dormer window to the rear of the newly created roof structure, with all associated site works.
Attic Conversion with velux roof light on the front and dormer window to the rear, pitched roof extension at the front and side of the dwelling at first floor level, new porch to the main entrance, widening of vehicular entrance and a domestic shed with hipped roof within the rear garden.
RETENTION: retention development will consist of a ground floor only detached building to the rear of the garden/site. Retention building to be used as home office & games room and all ancillary works.
RETENTION: Permission for 1) change of use (circa 1993) of a dwelling house into a crèche / Montessori; 2) the construction of a single storey extension to the front and rear of the crèche / Montessori; 3) the conversion of a garage to the side into crèche / Montessori space; 4) the addition of an escape fire door at first floor level to the side exiting onto the kitchen roof with an associated handrail and fixed ladder at first floor level, with all associated site works, all at 13 Saint Brendan's Avenue, Dublin 5.
(i) Construction of a single storey extension to the rear of existing dwelling with flat roof (ii) Construction of a new two storey extension to the side of existing dwelling with pitched roof (iii) Alterations to front elevation (iv) All associated site & landscaping works necessary to facilitate the development all at 31 Mask Avenue, Dublin 5, D05 K7V7.
The brief summarizes the pattern across all 6,667 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 3609/23The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief