Applications tied to the site
Partial coverage17 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
17 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
13% of nearby decided applications were refused. The site check found 7,763 decisions within 5 km, 17 exact-site or onsite candidate records, and 1032 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
17 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
17 matched1 of 2 layers are loaded for Dublin City Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedNo verified rural-housing citation is loaded for Dublin City Council, so this brief makes no current policy claim and relies on decision history.
2 of 4 layers are loaded for Dublin City Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
1032 structured nearby appeal records.
1,032 matchedCitations are current-dated and carry policy name, section, page and source URL from the Dublin City Council development plan.
1 matchedOpen preview
Open preview
Permission for change of use from residential apartment to doctor's surgery (80.7m2) and minor associated site works.
RETENTION: The development consists of two small extensions to the rear of the existing pharmacy at ground floor level resulting in additional floor space of 24.3m2.
The development will consist of the construction of a dormer window in the main roof to the rear of the house, building up to the side (south-east) hip to a gable (with window), the provision of two rooflights in the main roof to the front of the house along with all associated site works.
PERMISSION & RETENTION: Retention Permission for previously raised garden wall to public laneway, and Planning Permission for: a) First floor extension over previously converted garage to side of property 17.2 sq.m, b) Ground floor extension to rear of property 12.8 sq.m, c) Attic conversion to provide bedroom and ensuite with associated dormer to rear 26.4 sq.m, d) Refurbishment of existing porch and e) All ancillary works.
Planning permission for the demolition a rear extension and the construction of a new extensions to the front and rear, converting the attic space for storage purposes, realignment of the hipped roof to a pitched roof and raising the side gable to allow for extra head height above the stairs serving the attic, a dormer roof with windows to the rear of the main roof, the reconfiguration of the internal layout and all ancillary works necessary to facilitate the development.
Permission is sought to change the main roof from a hip to a gable adding a new gable end, flat roof dormer window to the rear of the main roof incorporating a non-habitable storage room in the attic space, new roof windows to the rear of the main roof and associated internal works in this semi-detached two storey house.
The brief summarizes the pattern across all 7,763 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 3632/24The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief