Permission for development at the site of Beaumont Hospital, Beaumont Road, Dublin 9 for: Critical Electrical Infrastructure Upgrade Including Alterations and/or Extension to 5 No. Existing Substations, and Alterations and First Floor Extension to TSD Building at Beaumont Hospital, Beaumont Road, Dublin 9, DO9V2NO. Gross development floor area of new-build elements will be 1118m2.
Planning precedent report
Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.Planning precedent report
Beaumont Hospital, Beaumont Road, Dublin 9
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
8% of nearby decided applications were refused. The preview found 6,855 nearby planning records within 5 km where a location match is available.
- Matched source
- 3659/24
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
No reasons on record yet
Open preview
Nearest similar decisions
RETENTION: The application comprises the retention of two existing single-storey portacabins and the retention of c.2.8m high blockwork wall (c.79 sq. metres). The purpose of this application is to allow the continued use of the existing office and meeting space to facilitate ongoing development works at Beaumont Hospital.
Permission for development at the site at Beaumont Hospital for the development of a new ground floor single storey hybrid theatre to the internal courtyard in conjunction with refurbishment to the existing theatre and supplies department to include for theatre suite, anaesthetic room, scrub, dirty utility, control room, prep room, technical equipment room, toilets, meeting room, recovery store, stores, recovery area, electrical cupboard and office. Theatre plantroom will be located at 1st floor. Gross floor area (existing and proposed) 452m2.
The development will comprise the following: provision of a new single storey modular building to accommodate the hospital medical records department (gross floor area: 339 sqm) and the provision of stair and ramp access with canopy overhead. Provision of stair and ramp access with canopy overhead to the hospital supply and disposal department. Alterations to existing staff car park layout to accommodate the proposed development. Provision of landscaping, services, signage and the undertaking of all associated site development works.
The proposed development comprises the erection of the roof mounted PV panels at rooftop level on the Smurfit Building at Beaumont Hospital, comprising a total array of 693 sq.m of PV panels, including a vertically mounted array of 45 sq.m of PV panels to the southern elevation of the rooftop plant room.
Two number new bike storage units to be located at two separate locations within the Beaumont hospital campus, one to the north-east of the Ashlin Centre and one adjoining an existing surface level car park to the east of the Trim Road entrance. Each bike storage unit will be an enclosed, covered single-storey structure with racks to accommodate 56 no. bikes and additional, dedicated space for parking cargo bikes. The gross development floor area of the new build elements will be 138 sq.m.
The full report covers all 6,855 decisions within 5km — with the planner's exact reasons, verbatim quotes and policy citations — delivered as a PDF. €49 incl. VAT.
Source match
Matched from public planning record 3659/24The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.