Free preview / €49 incl. VAT full PDF

Planning precedent report

Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.
See sample PDF
Opens secure checkout for the €49 incl. VAT full PDF report.Have a code? Enter it at checkout.
€49 incl. VAT once-off PDF, no account required
Refund requests are reviewed under the published refund policy
Derived from public planning records and linked source documents
PlanIntelPlanning precedent preview

Planning precedent report

site of 0.5 ha at Apollo House, Tara St (D02 N920); 9-11 Townsend St (incl. The Long Stone Pub) (D02 FE00); College House, Nos. 2-3 Townsend Street, (D02 F990), and the Screen Cinema, 16-19 Hawkins Street (D02 DP65), Dublin 2

One-off house / within 5 km where a location match is available

Preview

Local planning pattern

13% of nearby decided applications were refused. The preview found 12,882 nearby planning records within 5 km where a location match is available.

Matched source
3668/19
Project type
One-off house
Coverage
5 km radius
12,882Nearby applications
13%Refused
11,245Conditional grants
0Refusal reasons

Top refusal reasons nearby

No reasons on record yet

More refusal reasons are being processed from public planning records.

Nearest similar decisions

4170/19

Permission for development at a site of 0.57 ha at Apollo House, Tara St. (D02 N920); 9-11 Townsend St. (incl. The Long Stone Pub) D02 FE00); College House, Nos. 2-3 Townsend Street, (D02 F990) and the Screen Cinema, 16-19 Hawkins Street (D02 DP65), Dublin 2. The site is bounded by Townsend St. to the south, Tara St. to the east, Hawkins St. to the west, Hawkins House to the north and west and Poolbeg Street to the north. The development consists of amendments to previous permissions and proposed additional build to rent residential accommodation on previously permitted College House and the former Screen Cinema (DCC Reg. Ref: 3637/17, ABP Ref: PL29S.300709) and the former Apollo House DCC Reg. Ref.: 3036/16, ABP Ref: PL29S.247907) and as amended by DCC Reg. Ref.: 2415/19, as follows: 1. The proposed development consists of amendments to the permitted basement layouts including relocation of permitted core locations and alterations to plant areas and the addition of a residential waste store and residential cycle parking (76 cycle spaces). The proposals also include the reduction in car parking from 48 spaces to 40 spaces and an increase in cycle parking for the commercial offices from 404 spaces to 510 spaces (with an additional 20 at ground level). Decrease in permitted office amenity space at basement -1 from 505sq.m to 305sq.m2. Extension and increase in the extent and partial increase in heights of permitted Apollo House and College House developments where they adjoin onto the corner of Townsend St. and Tara St. There is no increase in overall maximum height of the permitted office buildings as a result of these proposed amendments. 3. The proposed development also includes new build to rent residential accommodation over part of the permitted Apollo House onto Poolbeg St. and Tara St. containing 54 residential apartment units (45 no. 1 bedroom and 9 no. 2 bedroom). The proposed residential element is ten storeys including a setback amenity floor with further set back screened plant. The proposed residential element includes communal internal residential amenity space of 207.9sq.m and external terraces on the east and west elevations. The proposed combined building height is 21 storeys (78.95m above street level). 4. Alterations to the proposed material and colour finishes of both permitted buildings, including minor alterations to the geometric arrangement of the facade. Proposed enclosure of the permitted plant screen on College House with a louvered cover. 5. Alterations to the permitted ground floor layouts of College House and Apollo House to include a new residential reception on Tara Street, the reconfiguration of the permitted office entrance foyers and the permitted cafe/retail/restaurant units and alterations to plant/services including a new ESB substation on Hawkins Street. These alterations include for a minor relocation of permitted ground and first floor external walls. 6. Overall minor decrease in permitted cafe/retail/restaurant floor space of 59 sq.m, increase in venue floor space of 87sq.m and increase in commercial floor space of 3,939 sq.m resulting from these proposed alterations. 7. The proposed scheme includes green roofs, PV panels, building lighting and associated signage.

Granted0.0 km03 December 2019
3668/19

Permission for development at a site of 0.5 ha at Apollo House, Tara St (D02 N920); 9-11 Townsend St (incl. The Long Stone Pub) (D02 FE00); College House, Nos. 2-3 Townsend Street, (D02 F990), and the Screen Cinema, 16-19 Hawkins Street (D02 DP65), Dublin 2. The site is bounded by Townsend St to the South, Tara St to the East, Hawkins St to the West, Hawkins House to the North and West and Poolbeg St to the North. The development consists of the amendment of previous permissions relating to College House and the former Screen Cinema (DCC Reg. Ref. 3637/17 ABP Ref: PL29S.300709) and the former Apollo House (DCC Reg. Ref.: 3036/16, ABP Ref: PL29S.247907) and as amended by DCC Reg. Ref.: 2415/19, as follows: 1. The proposed development consists of minor alterations to the existing permitted basement layouts including relocation of permitted core locations and alterations to plant areas. Also includes the reduction in car parking from 46 spaces to 33 spaces and an increase in cycle parking from 404 spaces to 470 spaces (incl. 20 at ground floor). 2. Extension and increase in the extent and partial increase in heights of permitted Apollo House and College House developments where they adjoin onto the corner of Townsend St and Tara St. There is no increase in overall maximum height of the permitted buildings as a result of these proposed amendments. 3. Alterations to the proposed material and colour finishes of both permitted buildings, including minor alterations to the geometric arrangement of the façade. 4. Alterations to the permitted ground floor layouts of College House and Apollo House to include the reconfiguration of the permitted office entrance foyers and the permitted café/ retail/ restaurant units, and alterations to plant/ services. 5. Overall minor decrease in permitted café/ retail/ restaurant floorspace of 107sqm and increase in office floorspace of 3,830 sqm resulting from these proposed alterations.

Granted0.0 km25 September 2019
2907/19

Permission for development at a site of 0.5 ha at Apollo House, Tara St. (D02 N920); 9-11 Townsend St. (incl. the Long Stone Pub) D02 FE00; College House Nos. 2-3 Townsend Street (D02 F990) and the Screen Cinema, 16-19 Hawkins Street (D02 DP65, Dublin 2. The site is bounded by Townsend St. to the South, Tara St. to the East, Hawkins St. to the East, Hawkins House to the North and West and Poolbeg St. to the North. The development consists of the amendment of previous permissions relating to College House and the former Screen Cinema (DCC Reg. Ref. 3637/17, ABP Ref: PL29S.300709) and the former Apollo House (DCC Reg. Ref.: 3036/16, ABP Ref: PL29S.247907) as follows: 1. The proposed development consists of the extension, amalgamation and reorganisation of the permitted basements and floor levels of both buildings and the removal of the permitted car lifts onto Townsend St., as permitted for the redeveloped College House site. The combined, two-level, basement will be accessed from a single ramp onto Townsend St. Cycle access to the basement will be via a dedicated, access controlled cycle lifts accessed from Townsend St.; an additional 71 cycle spaces are proposed in the basement, in addition to a relocation of some surface level cycle parking at ground level Reconfiguration of the permitted core layouts, from basement -2 to upper levels, including roof, in both buildings and amendments to associated site servicing (foul and surface water drainage and water supply) Amendments to finished floor levels in both buildings to align throughout and allow interconnectivity.. 2. Extension and increase in the extent and partial increase in heights of permitted Apollo House and College House developments where they adjoin onto the corner of Townsend St. and Tara St. There is no increase in overall maximum height of the permitted buildings as a result of these proposed amendments. 3. Alterations to the proposed material finishes of both permitted buildings. 4. Alterations to the permitted ground floor layouts of College House and Apollo House to include: Increased office entrance foyer of College House and connected cafe/restaurant unit onto the internal block of 138 sq.m. Amalgamation and increase of permitted retail/cafe/restaurant units in Apollo House and College House to single unit 1112 sq.m (with potential to subdivide into up to 3 individual units). Revisions to elevations at ground floor level as a result of reduction in external plant and basement access. Consolidation and relocation of permitted 2 no. substations into 1 no. substation onto Tara St. and 1 no. substation onto Townsend St. Increased office entrance foyer of Apollo House with ancillary cafe onto Tara St. and Poolbeg St. and minor increase in the size of permitted cafe/retail/restaurant unit on the new internal route to 161 sq.m. Provision of photovoltaic panels at roof level of permitted Apollo House and College House. Increase in permitted space at -1 level of Apollo House from 340 sq.m to 505 sq.m and removal of internal fire escape stair core. Overall increase in cafe/retail/restaurant floorspace of 153 sq.m and office floorspace 4,593 sq.m resulting from these proposed alterations.

Granted0.0 km26 June 2019
2415/19

Permission for development at a site of 0.5 ha at Apollo House, Tara Street (D02 N920) 9-11 Townsend St. (incl. The Long Stone Pub (D02 FE00) College House, Nos. 2-3 Townsend Street, (D02 F990) and the Screen Cinema, 16-19 Hawkins Street (D02 DP65), Dublin 2. The site is bounded by Townsend St. to the South, Tara St. to the East, Hawkins St. to the East, Hawkins House to the North and West and Poolbeg St. to the North. The development consists of the amendment of previous permissions relating to College House and the former Screen Cinema (DCC Reg. Ref: 3637/17, ABP Ref: PL29S.300709) and the former Apollo House (DCC Reg. Ref: 3036/16, ABP Ref: PL29S.247907) as follows: 1. The proposed development consists of the amalgamation and re-organisation of the permitted basements and floor levels of both buildings and the removal of the permitted car lifts onto Townsend St. as permitted for the redeveloped College House site. The combined, two-level, basement will be accessed from a single ramp onto Townsend St. Cycle access to the basement will be via a dedicated access controlled cycle lifts accessed from Townsend St.; an additional 25 cycle spaces are proposed in the basement, in addition to a relocation of some surface level cycle parking at ground level. Reconfiguration of the permitted core layouts, from basement -2 to upper levels, including roof, in both buildings and amendments to associated site servicing (foul and surface water drainage and water supply). 2. Alterations to the permitted ground floor layouts of College House and Apollo house to include: increased office entrance foyer of College House and additional retail/cafe/restaurant unit onto the internal block of 121sq.m. Amalgamation and increase of permitted retail/cafe/ restaurant units in Apollo House and College House to single unit of 1198sq.m (with potential to subdivide into up to 3 individual units). Revisions to elevations at ground floor level as a result of reduction in external plant and basement access. Consolidation and relocation of permitted 2 no. substations into 1 no. substation onto Tara St. and 1 no. substation ono Townsend St. Increased office entrance foyer of Apollo House onto Tara St. and Poolbeg St. and minor increase in the size of permitted cafe/retail/restaurant unit on the new internal route to 161sq.m. 3. Increase in permitted space at -1 level of Apollo House to 505sq.m and removal of internal fire escape stair core. 4. Overall minor increase in retail floorspace of 222sq.m and office floorspace 563sq.m resulting from these proposed alterations.

Granted0.0 km26 April 2019
WEB1404/26

The proposed development relates to permission for: • 1 no. ‘Workday’ high level sign comprising raised individual coloured acrylic lettering, fixed back to structure, with an overall area of 2.725m x 5.672m, internally illuminated with led lighting, located on the building inset at sixth floor level on the southern elevation on Townsend Street. • 1 no. ‘Workday’ high level sign comprising raised individual coloured acrylic lettering, fixed back to structure, with an overall area of 3.713m x 7.734m, internally illuminated with led lighting, located at eighth floor level on the northern elevation on Poolbeg Street.

Granted0.0 km17 April 2026
3684/21

We, College Square GP3 Limited, intend to apply for permission for development at a site of 0.64 ha at the former Apollo House, Tara Street (DO2 N920); 9-15 Townsend Street and 31-33 Tara Street, incl. The former Long Stone Pub (D02 FE00) and the Brokerage Apartment Building; the former College House, Nos. 2-3 Townsend Street, (D02 F990), and the former Screen Cinema, 16-19 Hawkins Street (DO2 DP65), Dublin 2. The site is bounded by Townsend Street to the South, Tara Street to the East, Hawkins Street to the West, Hawkins House to the North and West and Poolbeg Street to the North. The development consists of amendments and additions to the previously permitted redevelopment of the former College House and the former Screen Cinema (DCC Reg. Ref: 3637/17, ABP Ref: PL29S.300709) and the former Apollo House (DCC Reg. Ref.: 3036/16, ABP Ref: PL29S.247907) and as amended by DCC Reg. Ref.: 2415/19, DCC Reg. Ref.: 4170/19, ABP Ref: PL29S.306335 and DCC Reg. Ref.: 2583/20 as follows: 1. The proposed development consists of amendments to the permitted basement -2 layout including the increase in car parking from 39 spaces to 55 spaces (allowing for 5. No car sharing spaces, 5 No. car spaces for shared commercial and residential use and 6 No. car spaces for the commercial offices) and designation of areas within the basement for cargo bikes, e-bikes/e-scooter parking and charging facilities. 2. The proposed development also includes for an additional floor of development in the permitted build-to-rent residential accommodation building increasing permitted overall scheme height from 21 storeys (78.95 m above street level) to 22 storeys (82.1 m above street level) and increasing the no. of residential units from 54 no. build-to-rent units (45 no. 1 bedroom and 9 no. 2 bedroom) to 58 build-to-rent no. units (48 no. 1 bedroom and 10 no. 2 bedroom). The proposed development also includes for a relocation of the permitted communal internal residential amenity space from the proposed 21st floor (previously permitted 20th floor) to the 11th floor including conversion of roof area at 11th floor, on the southern elevation of the residential building, into external landscaped residential amenity space. The proposed amendments results in a total of 4 additional residential units.

Granted0.0 km08 March 2022

The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.

Policy and design risk

Full PDF

Source document extracts

Full PDF

Comparable decision table

Full PDF

Submission strategy

Full PDF
Ready to generate the full report?€49 incl. VAT once-off PDF, no account required