Applications tied to the site
Partial coverage10 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
10 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
12% of nearby decided applications were refused. The site check found 12,611 decisions within 5 km, 10 exact-site or onsite candidate records, and 3335 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
10 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
10 matched1 of 2 layers are loaded for Dublin City Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedNo verified rural-housing citation is loaded for Dublin City Council, so this brief makes no current policy claim and relies on decision history.
2 of 4 layers are loaded for Dublin City Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
3335 structured nearby appeal records.
3,335 matchedCitations are current-dated and carry policy name, section, page and source URL from the Dublin City Council development plan.
1 matchedOpen preview
Open preview
RETENTION PERMISSION:The development consists of retention permission for modifications to gates and piers previously granted under planning permission 2326/19 and all associated ancillary site works.
The development will consist of permission for modifications to previously granted planning permission 2326/19 including rear ground floor extensions of approximately 8 sqm to both houses and side elevational changes and all associated ancillary site works.
The development will consist of permission for demolition of existing house and replacement with 2 no. 4 bedroom, 3-storey detached houses, new access to the N11 Stillorgan Road and all associated ancillary site works.
The development will consist of (i) demolition of existing two-storey, four-bedroom, detached dormer bungalow and ancillary outbuildings, (ii) construction of a replacement part-single, part two-storey pitched-roof, four-bedroom, detached dwelling with green roof over single storey element and balcony to rear at first floor level, (iii) reconfiguration of existing vehicular entrance to provide new 3.485m wide gateway, (iv) provision of landscaping and tree-planting, and, (v) all ancillary and engineering works necessary to facilitate the development including SuDS drainage.
The development will consist of the demolition of the conservatory to the rear and chimney to the side, alterations to the side roof to create a new hipped roof to allow for the proposed attic conversion to include dormer and roof light to the rear with an additional rooflight to the side, widening of entrance gateway to the front and all other associated site works.
Alterations to the planning application granted under Reg. Ref. WEB2421/24 which allowed for the demolition of an existing dwelling and the construction of a new part three storey, part single storey detached replacement dwelling with green roof over single storey element and balcony to rear at first floor level, as well as alterations to the front boundary, landscaping and all associated ancillary works. The alterations proposed to the approved development include internal and external modifications as follows: (i) a revised alignment and footprint of the ‘L’ shaped single storey ground floor element positioned to the rear; (ii) the provision of an external jacuzzi and pergola with retractable covering at ground floor level immediately adjacent to the approved gym and music room; (iii) a minor reduction of floor area at ground floor level along the northeastern elevation and inclusion of new entrance door to mudroom / laundry room; (iv) an increase in the first floor level footprint by 20sqm to provide for a sauna and dressing room in the north-eastern section of the floor plan and an increase in the area of the bedroom in the north-western corner of the first floor level; (v) the provision of 2 no. external terraces to first floor level bedrooms along the western (front) elevation; (vi) an increase in the second floor level footprint by 32sqm. This level will now include 2 no. bedrooms with ensuites and walk-in closets, a reading room and a plant room. (vii) Minor interior reconfiguration across all floor levels to facilitate changes to the overall layout; and, (viii) all associated facade and external works, including the provision of new and replacement windows, doors, and opes, necessary to facilitate the proposed amendments. (ix) The proposal also includes all other associated engineering works including the provision of EV charging points and the removal of existing entrance pillars to replace with new automated sliding vehicular entrance gates, (x) landscaping works including the provision of planter beds, water features, a putting green, a tennis wall, (xi) and all other necessary works to facilitate the development. The proposed works will result in the permitted 7-bedroom house now comprising 6 bedrooms.
The brief summarizes the pattern across all 12,611 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 3700/19The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief