Planning permission for increasing number of children attending Adrienne’s Pre-School from currently 11 children to 22 children.
Planning precedent report
Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.Planning precedent report
82 Lorcan Grove, Santry, Dublin 9, D09 XP71
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
9% of nearby decided applications were refused. The preview found 7,266 nearby planning records within 5 km where a location match is available.
- Matched source
- 3717/21
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
Open preview
Nearest similar decisions
Planning permission for first floor extension to side and associated site works. Change and increase opening times for Adrienne’s Pre-School, change morning session from 8.30am – 12.00am and increase opening times from 12.15pm – 3.45pm.
The development will consist of the construction of new single storey pitched roof ancillary family accommodation to the side of existing dwelling to include bathroom, bedroom, kitchenette & living area. New raised porch roof and canopy between existing and proposed entrance doors. Removal of existing semi pitched roof to rear and construction of new flat roof over the existing kitchen & utility area. The development is to include internal alterations, landscaping and all ancillary site works and drainage.
Permission is sought for new signage consisting 1 no. 5.50m high totem sign, and all associated site works.
Permission sought for single storey extensions to front and rear and for flat roof over existing rear extension.
PERMISSION & RETENTION: Permission is sought for the retention and the continuation of the use of the existing take away outlet as previously granted a temporary 5 year permission under application 2238/10 & PL 29N.236666.
Source match
Matched from public planning record 3717/21The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.
Included in full report
Policy and design risk
Included in full report
Source document extracts
Included in full report
Comparable decision table
Included in full report