PERMISSION & RETENTION:Retention permission for (a) change of use from treatment clinic at first floor (with 2 no. shared ground floor door and 2 no stairs) to restaurant with kitchen at first floor (with 2 no. shared ground floor doors and 2 no. stairs); and b) planning permission for new signage at the front entrance door.
Planning precedent report
Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.Planning precedent report
4-5, Chatham Street (backing onto Tangier Lane), Dublin 2
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
13% of nearby decided applications were refused. The preview found 12,905 nearby planning records within 5 km where a location match is available.
- Matched source
- 3781/22
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
Open preview
Nearest similar decisions
RETENTION PERMISSION: (a) the retention of the change of use from off-licence retail wineshop to delicatessen at ground floor level, (b) the retention for minor alterations to the shopfront facing Chatham Street (including replacement of exiting signage).
PROTECTED STRUCTURE:The development shall consist of; repair works to the first, second and third floors of existing front façade facing onto Chatham Street comprising repair, repointing and cleaning of existing brickwork, repair of balcony and the repair and repainting of windows.
PROTECTED STRUCTURE: We, Gaiety Productions Unlimited Company, intend to apply for Planning Permission for development at Gaiety Theatre, Nos. 46–50 King Street South, Dublin 2, D02 V097 (a Protected Structure, RPS Ref. No. 4274). The proposed development will consist of the provision of a new Air Handling Unit (AHU) on the eastern roof to replace the existing system in a like-for-like manner; the replacement of the existing water tank on the roof with a new tank of similar size and location; the installation of new internal ductwork within the attic space to extract air from the auditorium and associated new ventilation grilles and louvres; structural repairs to the slabs forming the roof and floors on the eastern side of the Theatre; localised repair works to roof flashings, parapets, concealed gutters, roof lights, and junction areas; reinstatement and upgrade of rainwater outlets and downpipes from various roof levels; the installation of new gantry walkways, access ladders, and fall-protection systems to various roof areas to facilitate safe maintenance; the temporary removal, cleaning and reinstatement of the existing glazed canopy on the King Street South façade; and all ancillary and associated works required to facilitate the above and to improve the Theatre’s ventilation, building fabric and maintenance access.
Permission for a change to the existing shopfront including alterations to the entrance doorway, alterations to glazing and revisions to signage at 62-63 Grafton Street, Dublin 2, D02 FX05.
PROTECTED STRUCTURE: The development will consist of (a) the fit-out of the interior for retail purposes including the removal of existing modern fit-out partitions and fixed furniture; (b) the installation of new retail fit- out partitions and fixed furniture; (c) the installation of new connecting staircase from ground to first floor level replacing a modern staircase; (d) the upgrading of services provision & fire rated floors and walls within the building; (e) the replacement of existing retail signage within the signage area above the glazed shop windows with new simplified signage, and (f) a new disc logo sign affixed to the front elevation of the building.
The full report covers all 12,905 decisions within 5km — with the planner's exact reasons, verbatim quotes and policy citations — delivered as a PDF. €49 incl. VAT.
Source match
Matched from public planning record 3781/22The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.
Included in full report
Policy and design risk
Included in full report
Source document extracts
Included in full report
Comparable decision table
Included in full report