Applications tied to the site
Partial coverage7 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
7 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
13% of nearby decided applications were refused. The site check found 13,046 decisions within 5 km, 7 exact-site or onsite candidate records, and 2024 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
7 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
7 matched1 of 2 layers are loaded for Dublin City Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedNo verified rural-housing citation is loaded for Dublin City Council, so this brief makes no current policy claim and relies on decision history.
2 of 4 layers are loaded for Dublin City Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
2024 structured nearby appeal records.
2,024 matchedCitations are current-dated and carry policy name, section, page and source URL from the Dublin City Council development plan.
1 matchedOpen preview
Open preview
Permission to install spectrum monitoring equipment on the chimney of block 1. This spectrum monitoring equipment consists of three receive only antennas, along with a radio control unit.
PROTECTED STRUCTURE. PERMISSION & RETENTION.. Permission and retention for development at this site: Christ Church Cathedral, Christ Church Place, Dublin 8, (a protected structure). Development will consist of widening of main vehicular gate to accommodate delivery vehicles and fire tenders and retention of rearrangement of signage and display cases on perimeter railings.
Permission for internal re-configuration of the existing Healthcare Building along with the addition of 3.no single storey external ancillary rooms (27 m2) and 3 storey lift shaft to the rear (14m2), (total additional area 41m2) and all associated site works and services.
Planning permission for replacement of existing shopfronts and install new shopfront streetscape incorporating 5 no. retail units and apartment block entrance (6 no. in total) and all associated site development works.
PERMISSION The development will consist of the following: (i) change of use of the existing property from office to guesthouse accommodation use, providing for a total of 8 no. rooms comprising 4 no. single-rooms each with shared W/C, 2 no. double rooms each with private W/C and 2 no. triple rooms each with private W/C; (ii) demolition of existing internal walls and provision of new partition walls and internal doors where required at ground, first, second and third floor levels; (iii) provision of lounge and breakfast area with associated kitchen, staff room/reception area with staff W/C and 2 no. staff/guest W/C all at ground floor level; (iv) demolition of brick recessed opening to the front at third-floor level and replacement with new window opening with finish to match that as existing; (v) alterations to rear opes at ground floor level inclusive of the removal of existing garage door and provision of 2 no. new opes to facilitate access to bin store provided at ground floor level from St. Michael's Close, and fenestration to bedroom 1, with external wall finishes to match that as existing along St. Michael's Close; (vi) alterations to rear opes at first floor level including the removal of glazed screen and door and replacement with new insulated external wall and external access door to provide a terrace at the western elevation for bedroom no. 4; (vii) alterations to rear opes at second floor level including the removal of 2 no. existing opes and provision of 1 no. ope to provide fenestration with finishes to match that as existing; (viii) removal of steps and guarding at first floor rear terrace and replacement with pedestal paving and glass barrier all along St. Michael's Close; (ix) alterations to northern elevation within existing courtyard inclusive of replacement of existing windows at first and second floor level with insulated masonry rendered to match existing and replacement of existing windows at first, second and third floor level with 60-minute fire rated windows; and (x) all ancillary works, inclusive of planting, to facilitate the development.
The development will consist of the following: (i) alterations to rear opes at ground floor level inclusive of the removal of existing garage door and provision of 2 no. new opes to facilitate access to bin store provided at ground floor level from St. Michael's Close and fenestration to living room with external wall finishes to match that as existing along St. Michael's Close; (ii) alterations to rear opes at first floor level including the removal of glazed screen and door and replacement with new insulated external wall and external access doors; (iii) alterations to rear opes at second floor level including the removal of 2 no. existing opes and provision of 1 no. ope to provide fenestration with finishes to match that as existing; (iv) alterations to northern elevation within existing courtyard inclusive of replacement of existing windows at first and second floor level with insulated masonry rendered to match existing and replacement of existing windows at first, second and third floor level with 60-minute fire rated windows; (v) removal of steps and guarding at first floor rear terrace and replacement with pedestal paving and glass barrier all along St. Michael's Close; (vi) demolition of existing internal walls and provision of new partition walls and internal doors where required at ground, first, second and third floor levels, and provision of new kitchen and bathroom fittings to each unit; (vii) demolition of brick recessed opening to the front at third-floor level and replacement with new window opening with finish to match that as existing; (viii) a temporary 5-year change of use of the existing property from office to short-stay residential use through the provision of 4 no. short-stay apartment units (1 no. studio, 1 no. one-bed and 2 no. two-bed units); (ix) all ancillary works, inclusive of planting, all to facilitate the proposed development.
The brief summarizes the pattern across all 13,046 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 3871/24The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief