Executive snapshot
Local planning pattern
13% of nearby decided applications were refused. The preview found 12,723 nearby planning records within 5 km where a location match is available.
- Matched source
- 3871/24
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
Open preview
Nearest similar decisions
PROTECTED STRUCTURE. PERMISSION & RETENTION.. Permission and retention for development at this site: Christ Church Cathedral, Christ Church Place, Dublin 8, (a protected structure). Development will consist of widening of main vehicular gate to accommodate delivery vehicles and fire tenders and retention of rearrangement of signage and display cases on perimeter railings.
Permission for internal re-configuration of the existing Healthcare Building along with the addition of 3.no single storey external ancillary rooms (27 m2) and 3 storey lift shaft to the rear (14m2), (total additional area 41m2) and all associated site works and services.
Planning permission for replacement of existing shopfronts and install new shopfront streetscape incorporating 5 no. retail units and apartment block entrance (6 no. in total) and all associated site development works.
PERMISSION The development will consist of the following: (i) change of use of the existing property from office to guesthouse accommodation use, providing for a total of 8 no. rooms comprising 4 no. single-rooms each with shared W/C, 2 no. double rooms each with private W/C and 2 no. triple rooms each with private W/C; (ii) demolition of existing internal walls and provision of new partition walls and internal doors where required at ground, first, second and third floor levels; (iii) provision of lounge and breakfast area with associated kitchen, staff room/reception area with staff W/C and 2 no. staff/guest W/C all at ground floor level; (iv) demolition of brick recessed opening to the front at third-floor level and replacement with new window opening with finish to match that as existing; (v) alterations to rear opes at ground floor level inclusive of the removal of existing garage door and provision of 2 no. new opes to facilitate access to bin store provided at ground floor level from St. Michael's Close, and fenestration to bedroom 1, with external wall finishes to match that as existing along St. Michael's Close; (vi) alterations to rear opes at first floor level including the removal of glazed screen and door and replacement with new insulated external wall and external access door to provide a terrace at the western elevation for bedroom no. 4; (vii) alterations to rear opes at second floor level including the removal of 2 no. existing opes and provision of 1 no. ope to provide fenestration with finishes to match that as existing; (viii) removal of steps and guarding at first floor rear terrace and replacement with pedestal paving and glass barrier all along St. Michael's Close; (ix) alterations to northern elevation within existing courtyard inclusive of replacement of existing windows at first and second floor level with insulated masonry rendered to match existing and replacement of existing windows at first, second and third floor level with 60-minute fire rated windows; and (x) all ancillary works, inclusive of planting, to facilitate the development.
The development will consist of the following: (i) alterations to rear opes at ground floor level inclusive of the removal of existing garage door and provision of 2 no. new opes to facilitate access to bin store provided at ground floor level from St. Michael's Close and fenestration to living room with external wall finishes to match that as existing along St. Michael's Close; (ii) alterations to rear opes at first floor level including the removal of glazed screen and door and replacement with new insulated external wall and external access doors; (iii) alterations to rear opes at second floor level including the removal of 2 no. existing opes and provision of 1 no. ope to provide fenestration with finishes to match that as existing; (iv) alterations to northern elevation within existing courtyard inclusive of replacement of existing windows at first and second floor level with insulated masonry rendered to match existing and replacement of existing windows at first, second and third floor level with 60-minute fire rated windows; (v) removal of steps and guarding at first floor rear terrace and replacement with pedestal paving and glass barrier all along St. Michael's Close; (vi) demolition of existing internal walls and provision of new partition walls and internal doors where required at ground, first, second and third floor levels, and provision of new kitchen and bathroom fittings to each unit; (vii) demolition of brick recessed opening to the front at third-floor level and replacement with new window opening with finish to match that as existing; (viii) a temporary 5-year change of use of the existing property from office to short-stay residential use through the provision of 4 no. short-stay apartment units (1 no. studio, 1 no. one-bed and 2 no. two-bed units); (ix) all ancillary works, inclusive of planting, all to facilitate the proposed development.
The full report covers all 12,723 decisions within 5km — with the planner's exact reasons, verbatim quotes and policy citations — delivered as a PDF. €49 incl. VAT.
Source match
Matched from public planning record 3871/24The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.
Included in full report
Policy and design risk
Included in full report
Source document extracts
Included in full report
Comparable decision table
Included in full report