Applications tied to the site
Partial coverage4 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
4 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
8% of nearby decided applications were refused. The site check found 6,167 decisions within 5 km, 4 exact-site or onsite candidate records, and 711 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
4 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
4 matched1 of 2 layers are loaded for Dublin City Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedNo verified rural-housing citation is loaded for Dublin City Council, so this brief makes no current policy claim and relies on decision history.
2 of 4 layers are loaded for Dublin City Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
711 structured nearby appeal records.
711 matchedCitations are current-dated and carry policy name, section, page and source URL from the Dublin City Council development plan.
1 matchedOpen preview
Open preview
PROTECTED STRUCTURE: PERMISSION: Permission to erect 9,724.00 m2m2 or 1.77MV of photovoltaic panels on the roof of the buildings in our factory, in the complex called Cadbury's chocolate factory, with all associates site works at Mondelez Europe Services GMBH, Old Malahide Road, Malahide Road, Dublin 5, D05 TOH4. That currently operates under an Industrial Emissions (IE) License (P0809-01). Exist a protecting structure on the owner's land (Ref. No: 4861. Volume 4 of the 2022-2028 Dublin City Plan) and the National Inventory of Architectural Heritage (NIAH) consider the Cadbury's chocolate factory to be a 'Regionally' important complex of architectural, social, and technical interest, (NIAH Ref: 50130221), however both records are not affecting the area of the solar panel's installation.
The development will consist of: (i) The demolition of an existing 1950's, 4 no. storey concrete framed vacant office building located adjacent to the southern boundary of the subject site, including associated outbuildings, walls and foothpaths and; (ii) amendments to the existing car parking area located to the north of the office building proposed for demolition, to provide for a modified car parking area and a HGV/truck parking and marshalling area. More specifically, the development will include the following: (a) a modified car parking area for staff parking including 55 no. parking spaces (including 2 no. accessible parking spaces and 6 no. electric vehicle charging spaces); and b) a parking area for HGV's and trucks comprising 15 no. parking bays, together with space for loading and unloading of vehicles and a 'Pit' Type Weigh Bridge flush with the paved surface. The proposed development will also include all ancillary works necessary to facilitate the proposed development including hard and soft landscaping, a new bicycle shelter, foothpaths, EV car charging stations and the removal of existing gates and the provision new electric sliding gates to the HGV/truck parking area.
Planning permission for the development will consist of the demolition of an existing 68m x 16m x 18m high 4 no. storey concrete framed unoccupied office building and associated outbuildings, walls & footpaths and the construction of a replacement 62m x 20m staff car parking area and associated works.
The development will consist of the construction of a detached 3 storey, 3 bedroom dwelling house with a terrace at second floor level on vacant land directly adjacent to 72 Brookville Park, Coolock, D05 Y766. Proposed works include new pedestrian entrance off Brookville Park to the front of the property and a new vehicular entrance off Malahide Road to the rear of the site.
The development will consist of (a) an attic conversion with a proposed new rear dormer extension with 1no. rooflight to the rear and 2no. rooflights to the front of the existing roof (b) change in existing roof profile from hipped roof to gable end roof, (c) modifications to the existing ground floor front porch to include elevation changes and new flat roof design. (d) The development is to include for internal alterations, all associated site works, landscaping and drainage.
Planning permission at a two-storey semi-detached house. Development to consist of demolish single story attached shed to rear (4.8 sq.m) and new single-storey flat roof extension to front (3 sq.m) to provide porch & bay window plus new single-storey flat roof extension to rear (8.5 sq.m) plus alterations to windows at first floor level to front, side & rear elevations and all associated site development works including widening of existing vehicular entrance.
The brief summarizes the pattern across all 6,167 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 3878/23The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief