The development will consist of: the removal of existing external planters and guarding and removal of the ‘Canal Bar’ signage on the south elevation; Construction of a single storey glazed extension with flat roof to the front of the existing two storey building, to allow for additional seating area for bar use; Permission is also sought for an extended designated smoking area adjacent to the new proposed extension, and installation of new signage on proposed new extension, all with associated site works.
Planning precedent report
Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.Planning precedent report
The Lock Keeper Bar, formerly known as the Canal Bar, The Village Centre, Ashtown, Dublin 15
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
12% of nearby decided applications were refused. The preview found 5,702 nearby planning records within 5 km where a location match is available.
- Matched source
- 3899/20
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
Open preview
Nearest similar decisions
The development will consist of: - Demolition of internal wall between Supervalu Retail Unit 3/4 and Retail Unit 5. - Amalgamation of Supervalu Retail Unit 3/4 and Retail Unit 5. - Change of use of Retail Unit 5 from Retail use to Ancillary Off Licence Use.
Change of Use from Retail [Class A1] to Pilates studio [Class C2].
PERMISSION & RETENTION: Planning permission at existing temporary school for developments described as follows. 1. Construction of a single storey temporary prefabricated style school building consisting of 2 classrooms, resource room and toilet areas. 2. The retention of temporary use as primary school in former Castlethorn Construction Suite as granted under planning reference number 2657/15. Temporary planning permission for both described developments for a period not to exceed 31 January 2020 is being sought.
Planning permission for retention of: a. single storey shed/workshop, b. all associated site works
RETENTION: Permission for retention of: A. Full smooth plaster finish to entire front facade, as opposed to half plaster/half brick finish as proposed under previous Planning Ref. No: 4610/07. B. All associated site works at No 22 Martin Savage Park, Ashtown, Dublin 15.
Source match
Matched from public planning record 3899/20The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.
Included in full report
Policy and design risk
Included in full report
Source document extracts
Included in full report
Comparable decision table
Included in full report