Applications tied to the site
Partial coverage3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
12% of nearby decided applications were refused. The site check found 8,811 decisions within 5 km, 3 exact-site or onsite candidate records, and 1037 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matched1 of 2 layers are loaded for Dublin City Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedNo verified rural-housing citation is loaded for Dublin City Council, so this brief makes no current policy claim and relies on decision history.
2 of 4 layers are loaded for Dublin City Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
1037 structured nearby appeal records.
1,037 matchedCitations are current-dated and carry policy name, section, page and source URL from the Dublin City Council development plan.
1 matchedOpen preview
Open preview
Permission for development at this 0.747 ha site. The development will consist of: the demolition of 4 no. existing dwellings and ancillary buildings known as Nos. 1-4 Rivermount Cottages (320m2) and the construction of a residential development arranged in 3 no. blocks (Block A, B and C) ranging from 4 to 5 no. storeys in height over basement/undercroft level (12,106.2m2, including basement). Blocks A and B incorporate a setback fifth storey. The maximum height of the development, taken from street level is 20.9m, including lift overrun. The development will comprise 99 no. residential units (47 no. 1-bedroom apartments, 50 no. 2-bedroom apartments and 2 no. 3-bedroom apartments); residential amenity areas comprising residents lounge and meeting rooms (296.4m2) and private, communal and public open space provision (including balconies and terraces to be provided on all elevations at all levels for each block). The development also consist of: amendments to the existing northern boundary wall; the provision of a new set-down area on Ballyboggan Road; the provision of 57 no. car parking spaces and 3 no. motorcycle parking spaces at the basement/undercroft level; the provision of bicycle stores providing 162 no. long-stay bicycle parking spaces and 34 no. short-stay (visitor) bicycle parking spaces at basement/undercroft level and 36 no. short-stay bicycle parking spaces adjacent to Ballyboggan Road. The development will also include: New vehicular access arrangements, for residents, emergency/refuse vehicles, and pedestrian access is via Ballyboggan Road; minor upgrade works to Ballyboggan Road; all piped infrastructure and ducting; plant rooms; ESB substation; lift access and stair cores; internal roads and pathways; hard and soft landscaping and boundary treatments; changes in level; waste management areas; attenuation tank; lighting; and all associated site development and excavation works above and below ground. A Natura Impact Statement will be submitted to the planning authority with this application. The Natura Impact Statement will be available for inspection or purchase at a fee not exceeding the reasonable cost of making a copy during office hours at the offices of the relevant planning authority.
Planning Permission to construct dormer window in attic storage area on rear elevation of roof with flat roof finish.
PERMISSION & RETENTION: The development consists of the Retention Permission to the existing office / industrial unit of alterations to constructed building elevation for additional windows to the north elevation at first floor level and additional 83.32sqm of office floor space constructed to the existing first floor office layout. Application for Planning Permission consisting of construction of a protected stairwell within the unit from the first floor office area to the ground floor with construction of a new fire exit door from the stairwell to the north elevation of the building.
The development will consist of (i) extension to existing industrial building, (ii) a new storage building, (iii) removal of existing trees, (iv) revisions to existing signage and (v) all associated site works.
The proposed development will consist of the construction of a free standing single storey ESB Sub-Station (approx. 21.07 sq.m) to the side boundary of the site, (northeast side) and all associated site works.
Permission for development at this site (c. 0.136 ha) comprises the use of an existing warehouse unit as a 'cloud kitchen' comprising remote commissary kitchen pods and ancillary customer delivery service with associate site works including: internal subdivision and fit out, new external ventilation grilles and ducting replacement of existing external compound with new external refuse store (c. 21.3 sq.m.), 7 no. new bicycle stands and 2 no. new illuminated signs (c 3m x 1m) affixed to the south-east and south west building elevations.
The brief summarizes the pattern across all 8,811 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 3902/20The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief