Applications tied to the site
Partial coverage4 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
4 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
12% of nearby decided applications were refused. The site check found 6,054 decisions within 5 km, 4 exact-site or onsite candidate records, and 768 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
4 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
4 matched1 of 2 layers are loaded for Dublin City Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedNo verified rural-housing citation is loaded for Dublin City Council, so this brief makes no current policy claim and relies on decision history.
2 of 4 layers are loaded for Dublin City Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
768 structured nearby appeal records.
768 matchedCitations are current-dated and carry policy name, section, page and source URL from the Dublin City Council development plan.
1 matchedOpen preview
Open preview
The development will consist of the change of use from retail use of all floors, to coffee shop use at ground floor level and residential use at first and second floor level with 2 No. 2 bed duplex apartments across first and second floor, all with associated bin store and bike store at ground floor level, and associated site works and signage.
The development will consist/consists of a change of use from retail use to 1 No. 67.8 sqm restaurant use (with ancillary takeaway) at Ground floor level; with the provision of 1 no. 158.3 sqm 5 bedroom staff accommodation unit at first and second floor level associated with the restaurant / takeaway below at ground floor level; and associated mechanical plant to the rear of the building.
We, Party Food 4U LTD, intend to apply for permission for development at this site Unit 4, River Centre, Rathborne Place, Dublin 15. The proposed development involves the following: Change of use from retail to a pizzeria takeaway, which also includes preparation of food for social events for delivery and takeaway; Installation of signage above the front door and graphics on the main door; Provision of a new filtered extract and intake ventilation grill to the front of the building behind the existing louvres. All with ancillary site works.
The development will consist/consists of a change of use from retail use to 1 No. 91.4 sqm restaurant use (with ancillary takeaway) at ground floor level; and associated new ventilation extract grill to the front of the building.
The Development will consist of the construction of a ground floor, flat roof extension to the rear of the house, comprising a living area and utility room, together with all necessary internal modifications. The works include relocation of an access gate and concrete path to the side of the boundary wall for better utilization of available area, together with all associated landscaping and external works. It is also proposed to enlarge and convert a second-floor storage room into a single bedroom by construction of a rear facing dormer.
The development will consist of the construction of a part 2-storey, part single-storey prefabricated temporary school comprising of 12 classrooms and an administration block. The works will include a temporary carpark, bike parking, landscaping and associated boundary treatments. The Temporary School is for a maximum period of 2 years while the permanent Educate Together National School (RN203921) (granted under P0354) is constructed.
The brief summarizes the pattern across all 6,054 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 3913/20The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief