Free preview / €49 incl. VAT full PDF

Planning precedent report

Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.
See sample PDF
Opens secure checkout for the €49 incl. VAT full PDF report.Have a code? Enter it at checkout.
€49 incl. VAT once-off PDF, no account required
Refund requests are reviewed under the published refund policy
Derived from public planning records and linked source documents
PlanIntelPlanning precedent preview

Planning precedent report

St. Michael's & St. Raphael's Primary National Schools, Dominican Campus, Kylemore Road, Ballyfermot, Dublin 10, D10 YK84

One-off house / within 5 km where a location match is available

Preview

Local planning pattern

12% of nearby decided applications were refused. The preview found 6,659 nearby planning records within 5 km where a location match is available.

Matched source
3935/22
Project type
One-off house
Coverage
5 km radius
6,659Nearby applications
12%Refused
5,847Conditional grants
9Refusal reasons

Top refusal reasons nearby

Visual Amenity5
Residential Amenity3
Design1

Nearest similar decisions

3935/22

RETENTION: The development will consist of: retaining three existing prefabricated classroom buildings, one at 154m2 and two at 84m2 at the existing school campus. The classroom accommodation is of single storey prefabricated construction complete with WC facilities provided for in each separate building. The buildings are located within the rear playground areas and are separate from the existing school buildings. Access to each of the prefabricated classroom buildings is provided by wheelchair access ramps. The development was previously granted under planning reference 6779/07.

Granted0.0 km04 July 2022
3317/19

Planning permission for construction of new bay window and porch to the front of existing dwelling.

Granted0.1 km08 August 2019
5050/23

RETENTION: permission is sought for retention of single storey home office/playroom to rear garden and all associated site works.

Granted0.1 km22 February 2024
4626/19

Planning permission closing of the existing access to the Candle Centre (now occupied by Matt Talbot Community Trust) from the grounds of the Church of Our Lady of the Assumption and the opening of a new access to the Candle Centre from Colepark Drive. This involves the demolition of the boundary wall between the Candle Centre and 77 Colepark Drive, the demolition of the existing access gates and pillars access to the Candle Centre, alterations to the existing boundary wall at the Candle Centre and the reinstatement of the previously demolished walls in the existing boundary between the Church of Our Lady Of The Assumption adjacent and the site subject of planning.

Granted0.2 km19 March 2020
WEB1192/25

New ground level office /utility /studio building to rear garden (circa. 58m2) of existing dwelling with associated site works.

Granted0.2 km02 May 2025
2830/20

The development will consist of the restructuring of the external landscape and the renovation of the fire damaged existing one storey community centre to the rear of the property. External landscape works involve new garden areas, green house, car parking areas and building of a new boundary wall to the Cornamona land to the north of the site. Renovation works consist of an upgraded thermal envelope to the building including insulated render system and new windows and doors and the removal of adjacent sheds.

Granted0.2 km31 July 2020

The full report covers all 6,659 decisions within 5km — with the planner's exact reasons, verbatim quotes and policy citations — delivered as a PDF. €49 incl. VAT.

The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.

Policy and design risk

Full PDF

Source document extracts

Full PDF

Comparable decision table

Full PDF

Submission strategy

Full PDF
Ready to generate the full report?€49 incl. VAT once-off PDF, no account required