PROTECTED STRUCTURE. Permission is sought by Trinity College Dublin for permission for the installation of 1 no. free-standing bicycle shelter at Trinity Centre for Health Sciences, Trinity College Dublin, St. James's Hospital, Dublin 8. The proposed development is within the curtilage of a Protected Structure.
Planning precedent report
Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.Planning precedent report
Trinity Centre for Health Sciences, Trinity College Dublin, St. James's Hospital, Dublin 8
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
13% of nearby decided applications were refused. The preview found 12,264 nearby planning records within 5 km where a location match is available.
- Matched source
- 4036/24
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
No reasons on record yet
Open preview
Nearest similar decisions
PERMISSION AND RETENTION PERMISSION: Planning permission for proposed new vehicular access & driveway to the front garden & retention permission is sought for a first floor extension to the rear of the existing terrace dwelling.
RETENTION PERMISSION: the development consists of the retention of (1) a three storey Cardiology and Respiratory Unit (CRU) building with roof top boiler room and screened plant enclosure; (2) the enclosure of a courtyard area in the adjoining outpatient's department (phase 1C) and its conversion to office space for the breast check unit; (3) the reconfiguration of the adjoining waiting rooms and reception area in the outpatient's department; (4) the retention of a single storey central cycle hub building.
Planning permission - the proposed development will consist of a 4 storey, 1072 sq. m., 14.02 metre high infill to vacant yard and extension to the north of the existing mortuary building to serve as a bio-bank process storage unit accommodated over 2 floors with the additional 2 floors allocated to associated laboratory and administration functions; included will be a louvered open plant area 140 sq. m. at roof level, a further 2.7 metres high, all to match the existing building finishes; plant equipment and all other site development works, above and below ground required to facilitate the development, all located adjacent the north eastern boundary of the hospital campus. Vehicular access will be through the north entrance gates from Ewington Lane.
The construction of a single storey rear extension and garage structure constructed in 2005 and associated works. The extension consists of a WC and Hallway. The area of the extension and garage is circa 14.5m2 leaving the remaining amenity rear space of 9m2.
The development will consist of replacement/demolition of a temporary storage unit of 4.15m2 and the erection of a single storey building of 221m2, 41.15 metre high, to accommodate Clinical Supply Facilities, a patient reception area including linked access to the existing hospital corridors, plant equipment and all other site development works, above and below ground required to facilitate the development, all at podium level within Courtyard 12, Phase 1C of the Main Hospital Block. This proposed development is to facilitate the reconfiguration of the Cardiac Catheterisation Laboratory and associated departments.
The full report covers all 12,264 decisions within 5km — with the planner's exact reasons, verbatim quotes and policy citations — delivered as a PDF. €49 incl. VAT.
Source match
Matched from public planning record 4036/24The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.
Included in full report
Policy and design risk
Included in full report
Source document extracts
Included in full report
Comparable decision table
Included in full report