Applications tied to the site
Partial coverage2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
13% of nearby decided applications were refused. The site check found 12,558 decisions within 5 km, 2 exact-site or onsite candidate records, and 2102 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matched1 of 2 layers are loaded for Dublin City Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedNo verified rural-housing citation is loaded for Dublin City Council, so this brief makes no current policy claim and relies on decision history.
2 of 4 layers are loaded for Dublin City Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
2102 structured nearby appeal records.
2,102 matchedCitations are current-dated and carry policy name, section, page and source URL from the Dublin City Council development plan.
1 matchedOpen preview
Open preview
PROTECTED STRUCTURE. Permission is sought by Trinity College Dublin for permission for the installation of 1 no. free-standing bicycle shelter at Trinity Centre for Health Sciences, Trinity College Dublin, St. James's Hospital, Dublin 8. The proposed development is within the curtilage of a Protected Structure.
PERMISSION AND RETENTION PERMISSION: Planning permission for proposed new vehicular access & driveway to the front garden & retention permission is sought for a first floor extension to the rear of the existing terrace dwelling.
RETENTION PERMISSION: the development consists of the retention of (1) a three storey Cardiology and Respiratory Unit (CRU) building with roof top boiler room and screened plant enclosure; (2) the enclosure of a courtyard area in the adjoining outpatient's department (phase 1C) and its conversion to office space for the breast check unit; (3) the reconfiguration of the adjoining waiting rooms and reception area in the outpatient's department; (4) the retention of a single storey central cycle hub building.
The proposed development consists of the installation of rooftop telecommunications equipment including 6 no. Antennas, 1 no. dish, remote radio units (RRU’s), cable trays, GPS, site lamp, gantry poles, portable ladder, cabinets and all associated site development works in order to provide for high-speed wireless data and broadband services
Planning permission - the proposed development will consist of a 4 storey, 1072 sq. m., 14.02 metre high infill to vacant yard and extension to the north of the existing mortuary building to serve as a bio-bank process storage unit accommodated over 2 floors with the additional 2 floors allocated to associated laboratory and administration functions; included will be a louvered open plant area 140 sq. m. at roof level, a further 2.7 metres high, all to match the existing building finishes; plant equipment and all other site development works, above and below ground required to facilitate the development, all located adjacent the north eastern boundary of the hospital campus. Vehicular access will be through the north entrance gates from Ewington Lane.
The construction of a single storey rear extension and garage structure constructed in 2005 and associated works. The extension consists of a WC and Hallway. The area of the extension and garage is circa 14.5m2 leaving the remaining amenity rear space of 9m2.
The brief summarizes the pattern across all 12,558 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 4036/24The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief