The development will consist of a change in use of the existing ground floor interior from light industrial at the northern end of the building to expand the existing café usage into a restaurant with associated toilet and kitchen facilities. Furthermore, it consists of a change of use of the first-floor interior at the northern end from light industrial and office use to form a bar and billiard hall, again with associated access, toilets, storage space and all associated building services. External works include a single storey open canopy extension to the front of the building for additional restaurant seating with roof glazing and photovoltaic panels and a single storey extension to the rear of the building with first floor outdoor terrace and ground floor kitchen and food sale facilities. The building is to be reclad at first floor level to the front and rear elevations with a stained vertical timber cladding. The existing bin store is to be removed and replaced with a larger timber clad bin store to the rear.
Planning precedent report
Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.Planning precedent report
Unit 10/11, Santry Hall Industrial Estate, Santry, Dublin 9
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
10% of nearby decided applications were refused. The preview found 6,556 nearby planning records within 5 km where a location match is available.
- Matched source
- 4079/22
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
Open preview
Nearest similar decisions
RETENTION AND PLANNING PERMISSION:The development consists of: 1. change of use from warehouse store to training offices and warehouse store, 2. retention of offices on ground floor and a mezzanine area with a canteen and office, 3. the construction of proposed office/training room at mezzanine floor level, 4. retention for outdoor signage on front elevation, 5. planning permission for 2no. windows to the front elevation at first floor level and for all associated site works.
RETENTION for erecting 787.62 m2 or 150.88 kWp of photovoltaic panels on the roof of our Lidl Santry Store with all associates site works.
The proposed development will consist of modifications to the development permitted on site under DCC Reg. Ref.: 2713/17 and 2737/19. The proposal will include construction of an urban block comprising 3 no. 7 storey blocks (Blocks D, E, and F). - Block D, and the ground floors of Blocks E and F will provide c. 13,921 sqm office space (an increase of 2,454.7sqm). - Residential apartments are proposed on the upper floors of Blocks E and F providing 48 no. apartments (16 no. 1 beds, 24 no. 2 beds, and 8 no. 3 beds) to provide a new total of 253 no. residential units(in increase from 205 units). All residential units will have north/south/east/west facing private open spaces. The development will also include communal open space at podium level, 95 no. car parking spaces and 269 no. cycle parking spaces at surface and undercroft level (an increase of 15 no. car parking space and 164 no. cycle parking spaces), and all other site services and works to enable the development including bins, substations/plant areas, boundary treatments and landscaping.
Permission for development, consisting of modifications to a permitted mixed use development under Refs. 2713/17 and 2737/19, known as “Santry Place” located at Santry Avenue and Swords Road, Santry, Dublin 9. Permission is sought to demolish the remainder of an existing warehouse (1,758m2) and the construction of 3 no. 7-10 storey buildings (Blocks D, E, & F) accommodating residential, commercial and office uses. The proposed Block D (7 storeys) accommodates 48 no. apartments (i.e. 30 no. 1 beds & 18 no.2 beds) on first to sixth floor, over ground floor commercial use (247.9m2), residential amenity space (174.9m2), and bike & bin stores. Block E & F are 7 and 10 storeys respectively, accommodating ground floor commercial use (1,175.4m2) with office space overhead (11,206.5m2). The proposed development also provides for communal open space (1,026.3m2) at first floor podium level, internal and external bicycle parking (212 no. bicycle spaces), bin stores, and all associated site development works, on a site area of 0.65 ha. Car parking is provided in the form of surface and undercroft parking, with 67 no. surface spaces & 41 no. undercroft spaces. The effect of the proposed development will be a modification to the extant permissions under Refs. 2713/17 & 2737/19.
The development will consists of 1, demolition of existing single-storey timber shed (14.7 sq.m) and existing conservatory (6.6 sq.m); 2, construction of two-storey pitched roof extension with combined single-storey flat roof structure extension to rear garden; 3, relocate rear garden access at ground level; 4, widen front vehicular access entrance to Shanliss Avenue; 5, construction of single storey flat roof porch to front entrance and ancillary site works in association.
The full report covers all 6,556 decisions within 5km — with the planner's exact reasons, verbatim quotes and policy citations — delivered as a PDF. €49 incl. VAT.
Source match
Matched from public planning record 4079/22The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.
Included in full report
Policy and design risk
Included in full report
Source document extracts
Included in full report
Comparable decision table
Included in full report