Permission to convert attic space to storage space with addition of a dormer window to the west facing rear roof elevation and two roof lights to the front roof elevation.
Planning precedent report
Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.Planning precedent report
52 Clancy Road, Finglas East, Dublin 11
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
10% of nearby decided applications were refused. The preview found 5,164 nearby planning records within 5 km where a location match is available.
- Matched source
- 4081/24
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
No reasons on record yet
Open preview
Nearest similar decisions
RETENTION: Retention of existing single storey shed to rear of house for use as garden office/ studio ancillary to the house.
Permission for the demolition of existing single storey dwelling and garage due to fire damage and subsequent reconstruction of replacement single storey dwelling with Velux roof lights to the rear and side elevations and ancillary site works.
The development consists of the demolition of existing single storey pitched roof extension to the side/rear of the property and the construction of new two storey flat roof extension on the same footprint along with cantilevered extension at first floor level on the front elevation. Also included is a single storey extension to the rear of the dwelling at ground floor level. The development is to include window alterations to the side elevation, internal alterations, landscaping and all ancillary site works and drainage as required.
PERMISSION: To create a new vehicular entrance with kerb dishing to facilitate off street parking.
To create a new vehicular entrance with kerb dishing to facilitate off street parking.
Source match
Matched from public planning record 4081/24The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.
Included in full report
Policy and design risk
Included in full report
Source document extracts
Included in full report
Comparable decision table
Included in full report