Applications tied to the site
Partial coverage5 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
5 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
12% of nearby decided applications were refused. The site check found 10,295 decisions within 5 km, 5 exact-site or onsite candidate records, and 1217 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
5 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
5 matched1 of 2 layers are loaded for Dublin City Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedNo verified rural-housing citation is loaded for Dublin City Council, so this brief makes no current policy claim and relies on decision history.
2 of 4 layers are loaded for Dublin City Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
1217 structured nearby appeal records.
1,217 matchedCitations are current-dated and carry policy name, section, page and source URL from the Dublin City Council development plan.
1 matchedOpen preview
Open preview
Development to consist of; demolition of existing single storey extension (11m2), plus new ground-floor extension (29 m2) part flat-roofed with glazed rooflight, and new first-floor extension (19 m2) over with pitched-roof, plus, hard and soft landscaping and associated works, all to the rear.
Development will comprise the provision of a new vehicular entrance, car parking area to the front garden, dished paving at roadway, the provision of new vehicular entrance gates, piers and fencing and sundry associated landscaping works to all to SUDS requirement.
PERMISSION:For demolition of existing shed to rear and construction of new single storey garden studio with storage mezzanine, roof glazing to rear and front and to include all ancillary site works at rear laneway and rear garden of an exsting terraced two storey dwelling.
RETENTION alterations to previously granted planning (Reg Ref: WEB1718/24). The alterations consist of a) increase to roof ridge-height for the two-storey element of the extension, b) alterations to fenestration to front elevation, c) revised rooflight positions to side elevation.
The development will consist of alterations to previously permitted first floor extension element (File Ref: WEB1052/19) to increase floor area (all to rear) and create additional window to proposed first floor side elevation, revised internal layout to create additional bedroom and all associated, site, drainage, ancillary and landscaping works.
The development will consist of • Demolition of the existing garage to the side • The construction of a part single storey part two storey extension to the side and part single part two storey extension to the rear to include new rooflight • Alterations to the porch to the front elevation • Increase of width of vehicular entrance to 3.5M in width • All associated internal and external alterations to the existing dwelling, site, drainage and landscaping works.
The brief summarizes the pattern across all 10,295 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 4094/19The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief