Applications tied to the site
Partial coverage36 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
36 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
13% of nearby decided applications were refused. The site check found 13,064 decisions within 5 km, 36 exact-site or onsite candidate records, and 2121 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
36 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
36 matched1 of 2 layers are loaded for Dublin City Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedNo verified rural-housing citation is loaded for Dublin City Council, so this brief makes no current policy claim and relies on decision history.
2 of 4 layers are loaded for Dublin City Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
2121 structured nearby appeal records.
2,121 matchedCitations are current-dated and carry policy name, section, page and source URL from the Dublin City Council development plan.
1 matchedOpen preview
Open preview
Permission for development at 71 Thomas Street, Dublin 8, a mixed-use, mid-terrace, 3 storey building with a restaurant at ground floor level and 2 no residential apartments at first and second floor levels. The development will consist of the construction of a new two storey extension at roof level containing 1 no duplex apartment (107sqm) and 2 no new balconies at 4th floor level, one to front (7sqm) and one to rear (5.6sqm), modifications to internal layouts, replacement of existing fenestration and restoration of the façade including repointing of brickworks, all associated ancillary, landscaping and site development works.
PERMISSION The proposed development will consist of: 1) Removal of existing Ground level roller shutter, shopfront surrounds, signage board and doorways onto Thomas Street; 2.) Construction of new Ground Level shopfront, surrounds, signage board, lighting and doorways onto Thomas Street; & 3.) All associated works.
PROTECTED STRUCTURE: RETENTION/PERMISSION. Retention permission is sought for: (i) an existing external basement access hatch; and Planning Permission is sought for: (ii) the refurbishment and change of use of the existing property on site from commercial (office) use to short-stay residential use through the provision of 4 no. 1-bedroom, short-stay apartment units, one at each level from ground to third floor levels. The proposed works to facilitate this change of use include internal modifications and reconfiguration from ground to third floor levels including: (a) removal of existing modern glazed fire lobby at ground floor level which is to be reused at third floor level and the provision of a new fire lobby at ground floor level including new fresh air duct ventilation to terminate at roof level; (b) relocation of internal door at ground floor level; (c) removal of existing non original partition walls, doors, bathroom and kitchen fittings at first floor level; (d) removal of 1 no. non-original internal door at third floor level, amendment to the positioning of an existing doorway to accommodate a new fire lobby, and removal of non-original bathroom fittings all at third floor level; (e) removal of existing carpet floor finish from ground to third floor levels and retention and refurbishment of existing timber boards; (f) Existing stair core at ground, first, second and third floor levels to be retained and refurbished; (g) provision of new partition walls and internal doors where required at ground, first, second and third floor levels, and new kitchen and bathroom fittings. External works proposed include: (iii) the provision of a new communal bin store to be located in the rear open space area; (iv) removal, replacement and increase in the size of 2 no. existing high level windows at first floor level to the rear and amendments to the associated cills; (v) removal, replacement and increase in the size of 1 no. non-original sash window at third-floor level to the rear and amendments to associated cill; (vi) removal of security bars from windows to the rear; (vii) removal of existing soil pipes to the rear elevation; and (viii) all associated ancillary works necessary to facilitate the proposed development.
PROTECTED STRUCTURE:RETENTION/PERMISSION:permission for development comprising planning permission for (i) the refurbishment and change of use of the existing property on site from commercial (office) use to residential use through the provision of 4 no. 1-bedroom apartment units, on at each level from ground to third floor levels. The proposed works to facilitate this change of use include internal modifications and reconfiguration from ground to third floor levels including: (a) removal of existing modern glazed fire lobby at ground floor level which is to be reused at third floor level and the provision of new fire lobby at ground floor level including new fresh air duct ventilation to terminate at roof level; (b) relocation of internal door at ground floor level; (c) removal of existing non original partition walls, doors, bathroom and kitchen fittings at first floor level; (d) removal of 1 no. non-original internal door at third floor level, amendment to the positioning of an existing doorway to accommodate a new fire lobby and removal of non-original bathroom fittings all at third floor level; (e) removal of existing carpet floor finish from ground to third floor levels and retention and refurbishment of exiting timber boards; (f) existing stair core at ground, first, second and third floor levels to be retained and refurbished; (g) provision of new partition walls and internal doors where required at ground, first, second and third floor levels and new kitchen and bathroom fittings. External works proposed include: (ii) the provision of a new communal bin store to be located in the rear open space area; (iii) removal, replacement and increase in the size of 2 no. existing high level windows at first floor level to the rear and amendments to the associated cills; (iv) removal, replacement and increase in the size of 1 no. non-original sash window at third-floor level to the rear and amendments to associated cill; (v) removal of security bars from windows to the rear; (vi) removal of existing soil pipes to the rear elevation; (vii) all associated ancillary works necessary to facilitate the proposed development. Retention permission is sought for an external basement access hatch.
PROTECTED STRUCTURE: the proposed development will consist of: (i) the refurbishment and change of use of the existing property on site from commercial (office) use to short-stay residential use through the provision of 4 no. 1-bedroom short-stay apartment units, one at each level from ground to third floor levels. The proposed works to facilitate this change of use include internal modifications and reconfiguration from ground to third floor levels including: (a) removal of existing modern glazed fire lobby at ground floor level which is to be reused at third floor level and the provision of a new fire lobby at ground floor level including new fresh air duct ventilation to terminate at roof level; (b) relocation of internal door at ground floor level; (c) removal of recessed storage unites along the western internal wall at ground floor level; (d) removal of existing non original partition walls, doors, bathroom and kitchen fittings at first floor level; (e) removal of 1 no. non-original internal door at third floor level, amendment to the positioning of a n existing doorway to accommodate a new fire lobby and removal of non-original bathroom fittings all at third floor level; (f) removal of existing carpet floor finish from ground to third floor levels and retention and refurbishment of existing timber boards; (g) existing stair core at ground, first, second and third floor levels to be retained and refurbished; (h) provision of new partition walls and internal doors where required at ground, first, second and third floor levels and new kitchen and bathroom fittings. External works proposed include: (ii) the provision of a new communal bin store to be located in the rear open space area; (iii) removal, replacement and increase in the size of 2 no. existing high level windows at first floor level to the rear and amendments to the associated cills; (iv) removal, replacement and increase in the size of 1 no. non-original sash window at third floor level to the rear and amendments to associated cill; (v) removal of security bars from windows to the rear; (vi) removal of existing soil pipes to the rear elevation; (vii) all associated ancillary works necessary to facilitate the proposed development.
PROTECTED STRUCTURE: Permission to increase the height of the rooftop chimney for the purpose of enclosing 3 no. telecommunications antennas and 1 no. dish to affix telecommunications equipment upon the building rooftop, together with all associated works.
The brief summarizes the pattern across all 13,064 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 4106/19The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief