Applications tied to the site
Partial coverage9 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
9 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
13% of nearby decided applications were refused. The site check found 11,444 decisions within 5 km, 9 exact-site or onsite candidate records, and 1460 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
9 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
9 matched1 of 2 layers are loaded for Dublin City Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedNo verified rural-housing citation is loaded for Dublin City Council, so this brief makes no current policy claim and relies on decision history.
2 of 4 layers are loaded for Dublin City Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
1460 structured nearby appeal records.
1,460 matchedCitations are current-dated and carry policy name, section, page and source URL from the Dublin City Council development plan.
1 matchedOpen preview
Open preview
Planning permission to erect 841.00m2 or 150.30 kWp of photovoltaic panels on the roof of our existing Lidl Store at Cabra, with all associated site works.
The development will consist of the construction of a two-storey, two-bedroom end of terrace dwelling, including adaptation of the existing boundary wall, a rear landscaped courtyard, and all associated site and ancillary works.
The development will consist of the construction of a three-storey, three-bedroom semi-detached dwelling, including adaptation of the existing boundary wall, a rear landscaped courtyard, and all associated site and ancillary works.
PERMISSION:The proposed application will comprise eight new units on a 0.124-hectare site. This will include the construction of a 3- storey terraced residential development. It shall consist of 4 No. 3-bed apartments with car parking and communal open space at ground floor level and 4 No. 4-bed duplex apartments on the upper floors. All with associated private open space, bike storage, bin storage, and other necessary site works. The overall mass and form of the buildings are like that of the existing properties near the area in terms of design, materiality, and detailed finishes.
Permission for modifications to previously granted development, planning ref. no. 2965/15 (ABP PL29N.245656) and extended by 2965/15/x2 for 4 no. 3-bed 3 storey terraced dormer houses at this site. The modifications will consist of increase in size of the units at ground, first & second floor to accommodate an additional bedroom now provided, 4 no. 4-bed 3 storey terraced dormer houses with modifications to as granted elevations, internal layouts with bike storage and bin storage. All with associated site works, car parking, landscaping and boundary treatment.
Construction of a 77 sq.m Family Flat to the rear of existing dwelling.
The brief summarizes the pattern across all 11,444 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 4201/22The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief