Applications tied to the site
Partial coverage13 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
13 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
13% of nearby decided applications were refused. The site check found 13,474 decisions within 5 km, 13 exact-site or onsite candidate records, and 2488 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
13 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
13 matched1 of 2 layers are loaded for Dublin City Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedNo verified rural-housing citation is loaded for Dublin City Council, so this brief makes no current policy claim and relies on decision history.
2 of 4 layers are loaded for Dublin City Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
2488 structured nearby appeal records.
2,488 matchedCitations are current-dated and carry policy name, section, page and source URL from the Dublin City Council development plan.
1 matchedOpen preview
Open preview
PROTECTED STRUCTURE: Permission for the restoration and refurbishment of the front facades of Loreto College, No's 53, 54 and 55 St. Stephens Green, Dublin 2 all of which are Protected Structures. The works will consist of the following; (1) No. 53 St. Stephens Green- existing cementitious pointing to be carefully raked out of brickwork and stonework, careful steam cleaning and lime mortar repointing of the brickwork and parapet stonework to front façade and low wall to front railings, careful removal and reinstatement of front steps to main entrance, refurbishment of sash windows where required, repainting of plastered walls and all wrought iron railings, (2) No. 54 St. Stephens Green - existing cementitious pointing to be carefully raked out of brickwork and stonework, careful steam cleaning and lime mortar repointing of the brickwork and stonework to front façade and low wall to front railings, refurbishment of sash windows where required, refurbishment of feature surrounds to 6no. windows located at ground and first floor levels, repainting of plastered walls and all wrought iron railings, (3) No. 55 St. Stephens Green - careful steam cleaning of brickwork and stonework to front façade and low wall to front railings, refurbishment of sash windows where required, repainting of plastered walls and all wrought iron railings at Loreto College, No's 53, 54, and 55 St. Stephens Green, Dublin 2. No's 53, 54, and 55 St. Stephens Green, Dublin 2 are listed on the Dublin City Council Record of Protected Structures - Ref's 7786, 7787 and 7788 respectively.
PROTECTED STRUCTURE: the proposed development relates solely to the sports hall located to the south-east of the overall landholding, which is within the curtilage of the protected structures. No works are proposed to any designated protected structures. The development will principally consist of a 168.8 sq m extension to the building comprising a lateral extension 82.6 sq m along the south western elevation at ground floor level and a vertical extension of 86.2 sq m along the north western elevation at first floor level (no change to maximum height of the building); reconfiguration of the internal layout; general elevational changes; replacement of roof and rooflights; plant including new heat pumps on the north-eastern elevation of the building and all associated site works above and below ground.
PROTECTED STRUCTURE: The Board of Management of Loreto College intend to apply for permission for development at the site of Loreto College, 53-55 St. Stephen's Green, Dublin 02, D02 XE79 (includes Protected Structures). The proposed development relates solely to the Sports Hall located to the south-east of the overall landholding, which is within the curtilage of the Protected Structure. No works are proposed to any designated protected structures. The proposed development amends a permitted development as granted under DCC Reg. Ref.3171/24. The development will principally consist of minor changes including the removal of part of the previously granted extension, specifically the 82.6 sqm lateral extension along the south-western elevation at ground floor level; reconfiguration of the internal layout; general elevational changes; removal of an existing shed; relocation of permitted external plant; and all associated site works above and below ground.
PROTECTED STRUCTURE: Permission is sought for the continuation of office use of the basement level of 4 Ely Place Upper.
Permission to install temporally a low tac vinyl design to the east and north facade of our premises. The design by the artist Maser would be for a period of six months from September 18th 2023 to January 14th 2024.
PROTECTED STRUCTURE: The development will consist of the replacement of the existing entrance lobby with a new aluminium framed draught lobby and the redesign of the existing plaza to the front of the building.
The brief summarizes the pattern across all 13,474 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 4253/19The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.