Applications tied to the site
Partial coverage3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
13% of nearby decided applications were refused. The site check found 10,862 decisions within 5 km, 3 exact-site or onsite candidate records, and 2068 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matched1 of 2 layers are loaded for Dublin City Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedNo verified rural-housing citation is loaded for Dublin City Council, so this brief makes no current policy claim and relies on decision history.
2 of 4 layers are loaded for Dublin City Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
2068 structured nearby appeal records.
2,068 matchedCitations are current-dated and carry policy name, section, page and source URL from the Dublin City Council development plan.
1 matchedOpen preview
Open preview
Permission for development at this site (0.72 hectare), known as Site 1b St. Michael's Estate, Inchicore, Dublin 8 bounded by Richmond Barracks to the north, the rear of Connolly Avenue to the east and Thornton Heights to the south. The development will consist of a one to four storey older persons housing with supports scheme, incorporating: (i) 52 no. apartment dwellings with balconies; (a) 16 no. 2 bedroom apartments; (b) 36 no. 1.5 bedroom apartments. (ii) Communal facilities at ground floor level to include a multipurpose room, additional ancillary spaces, staff offices and a publicly accessible tea room (26.5m2). (iii) Landscaping works to include resident courtyards and a landscaped open space (facing the St. Michaels Estate road) incorporating a new vehicle setdown area. (iv) 15 no. car parking spaces. (13 no. new car parking spaces to be accessed from an existing vehicular entrance and the relocation of 2 no. existing car parking spaces adjacent to the new vehicle setdown area). (v) 52 no. bicycle parking spaces. (vi) (ESB substation), external signage, site perimeter boundary treatments, plant rooms, waste storage enclosures and all associated ancillary development works and services. (vii) The development will consist of the following floor areas: - Total gross internal floor area (GIA): 4,655m2 (inclusive of all residential, communal, vertical circulation & ancillary spaces). - Area of external deck/gallery access (excluding balconies): 1,066.6m2. - Area of roof terrace (excluding balconies): 100.1m2. (viii) The building will be one to four storeys in height, with a top parapet level of 40.04m OD (measuring 14.835m above finished ground floor level).
The development will consist of alterations and extension to the existing two storey end of terrace dwelling. The works will consist of (1) demolition of existing ground floor rear extension (2) construction of two-storey extension to the rear, (3) all associated site works
Construction of a new 2 storey rear & side extension, to provide kitchen, dining, sitting at ground level, new bathroom, bedroom 1st floor. Works include minor internal alterations, demolition existing rear shed, increase size vehicular side access, 1 velux to side main roof & associated site development works.
The development will consist of the demolition of an existing single storey rear extension and the construction of a new two storey rear extension and associated site works
Planning permission for the construction of a single storey extension to gable end and rear of house also all associated site works at 13 Godenbridge Terrace Inchicore, Dublin 8.
PERMISSION for the construction of a first floor extension over existing extension to gable and front and rear of house, also all associated site works.
The brief summarizes the pattern across all 10,862 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 4260/19The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief