The development will consist of a change of use of petrol filling station to provide bus parking and all associated site works including new boundary treatment to the Northern side of the site adjacent to Conyngham Road. This proposal also seeks to remove the hoarding to the boundary facing Conyngham Road. The site at present is derelict and has not been used as a petrol filling station since 2019. Vehicular access and egress will be by existing dished kerb entrance to the eastern side of the site. A new pedestrian entrance from Conyngham Road will also be created.
Planning precedent report
Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.Planning precedent report
19, Conyngham Road, Dublin 8 , D08CH92
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
13% of nearby decided applications were refused. The preview found 11,571 nearby planning records within 5 km where a location match is available.
- Matched source
- 4281/24
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
No reasons on record yet
Open preview
Nearest similar decisions
Demolition of the existing disabled access ramp, planter and adjacent steps, removal of 2 no existing car parking spaces, partial demolition of the main stepped entrance and construction of a replacement Part M compliant access ramp, planter, adjacent steps and disabled parking bay and all associated external works, services, drainage and landscaping works required to be undertaken in conjuction with this application.
PROTECTED STRUCTURE: Permission is sought for works to Nos. 3 and 4 Conyngham Road, Phoenix Park, Dublin 8, Protected Structures (RPS no. 2035 and 2036), to consist of the following: Change of use of no. 4 from residential (other) to office use (318m2); Demolition of single storey rear extension to no. 3 (12m2), demolition of external boiler house to No. 4 (2m2) and removal of existing external steel stair at the rear of No. 4; Construction of separate single storey extensions to the rear of both No. 3 (11m2) and No. 4 (50m2) and construction of a new three storey mews building (172m2) to rear lane (Eaves Height 7.1m from external ground level), consisting of two-storey office accommodation over car parking (four spaces including one disabled space), on the footprint of the original mews building. Internal works: includes material alterations, repairs and services internally, to both properties with an interconnecting doorway on the first floor and the provision of an internal lift at No. 4. External works: replacement of windows to include new vertical sliding timber sash windows to the front of No. 4, details to match the existing windows at No. 3, formation of new ope in garden wall between properties, new hard and soft landscaping proposal, new covered pergola walkway linking the three buildings within the garden area, ten new sheltered bicycle parking spaces and all associated site services. The proposal will result in office use throughout No. 3, No. 4 and the new mews building, catering for 69 persons, including auxiliary facilities.
The development will consist of demolition of existing two storey over double basement building (338 sq m) comprising Romayos Diner at basements and ground floors and residential units at first floor and the construction of a five storey over double basement building (1,007 sq m.) comprising storage at lower basement floor, storage, bicycle store and bin store at upper basement floor, retail or restaurant unit at ground floor, 2 No. One-Bedroom Apartments on each of first, second, third and fourth floors (8 No. One Bedroom Apartments in total) and ancillary works.
Planning permission for demolition of existing two storey over double basement building (352 sq.m) at 41 Parkgate Street, Dublin 8 and the erection of a five storey over double basement apartment building (886 sq.m) containing 13 apartments, as follows: 2 no. one bed studios, 10 no. one bed units and one two bed unit, all with external terraces / balconies on south side of each unit (within central lightwell for unit nos: 2, 4, 6, 8, 10 and 12) with an additional one to the north of unit 13 and associated works.
The proposed development will provide a mixed use commercial development comprising of a hotel (238 no. bedrooms) and an office block delivering a cumulative Gross Floor Area (GFA) of 32,602 sq.m, inclusive of basement area. The proposed development consists of: -Site clearance and localised demolitions to remove part of the podium and Basement Level-1 reinforced concrete slabs at the interface of the proposed hotel and office blocks, together with the incorporation of part of the existing basement level structure extending to approximately 4,228 sq.m (GFA). -The proposed basement will be integrated within the existing basement levels serving the wider HSQ development and will be accessed from the existing vehicular ramped accesses/egresses onto/off St. John's Road West and Military Road to the north and east, respectively. The proposed basement area is split into two areas to provide a dedicated Hotel Basement area of approximately 2,132 sq.m (GFA) and an Office basement area of 2,096 sq.m (GFA) -The construction of a 5-storey hotel (over lower ground and basement levels) to provide 238 no. bedrooms. At basement level provision is made for 24 no. car parking spaces; 2 no. motorcycle spaces together with plant and storage rooms. A waste storage area with dedicated loading bay/ staging area is provided along with dedicated set-down area for deliveries. A dual-purpose service bay is also provided at basement level with modifications to existing line markings to the basement parking area to accommodate the development. At Lower Ground floor level provision is made for 14 no. Bedrooms; Conference Room; Kitchen and Staff facilities and Changing Rooms/ WCs plus ancillary Gym. This floor is arranged around an internal courtyard space. Provision is made at Podium level for 19 no. Bedrooms; Dining Area and Foyer with entrance at the South-Eastern corner of the building onto a new laneway separating the proposed hotel and office building. Provision is made at the south-western corner at podium level for an ESB sub-station/switch room and 15 no Sheffield type bicycle stands are provided for the hotel and the retail/cafe unit, providing storage space for 30 no. bicycles. A total of 205 no. bedrooms are provided at the upper levels (above podium level). The top floor of the hotel (4th floor) has a splayed setback to provide a west facing roof terrace. An ancillary hotel bar (118 sq.m) opens onto this roof terrace. -The construction of a 12-storey (over lower ground and basement levels) office building to the east of the proposed hotel building to provide 19,474 sq.m of office floorspace (GFA) from lower ground floor level and above. Provision is made at basement level for 30 no. car parking spaces; 2 motorcycle spaces and 120 no. bicycle storage spaces together with plant and storage rooms. Provision is made for a further 196 no. bicycle storage spaces at Lower Ground floor level plus changing rooms (including showers). At podium level 2 no. ESB sub-stations and switch rooms are proposed. The foyer and entrance is provided at the southern end of the building at Podium level along with a Retail/Cafe unit of 208 sq.m at the South-Western corner of the building. The building is setback at 4th floor level to provide a west facing roof terrace. Splayed setbacks to the southern and eastern elevations at the 11th floor level forms a roof terrace that wraps around the South-Eastern corner of the building. Plant is provided at rooftop level that is enclosed by curved louvred screens and PV panels. -Works proposed along the St John's Road West frontage include the omission of the existing left-turn filter lane to the vehicular ramped access to the HSQ development and re-configuration of the pedestrian crossing at the existing junction together with the re-configuartion of the existing pedestrian crossing over the westbound lanes of St. John's Road West leading to an existing pedestrian refuge island and re-alignment of the existing foothpath along the site frontage onto St. John's Road West to tie into the reconfigured junction arrangement. -Drainage works proposed include the provision of 2 no. below basement surface water attenuation tanks with dusty/stand-by arrangement pump sumps and associated valve chambers, and 2 no. below basement foul pump sumps with duty/stand-by arrangement and 24hr emergency storage and associated valve chambers. New foul drainage and stormwater drainage connections are proposed to existing foul and storm sewers in St. John's Road West with associated site works. -Hard and soft landscaping works are proposed at lower ground level along St John's Road West and at podium level to provide for the extension and completion of the public plaza to the south of the proposed Office Block and the provision of a new pedestrian laneway connecting St John's Road West with the public plaza at podium level. The application is accompanied by an Environmental Impact Assessment Report (EIAR) and Natura Impact Statement (NIS).
The full report covers all 11,571 decisions within 5km — with the planner's exact reasons, verbatim quotes and policy citations — delivered as a PDF. €49 incl. VAT.
Source match
Matched from public planning record 4281/24The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.
Included in full report
Policy and design risk
Included in full report
Source document extracts
Included in full report
Comparable decision table
Included in full report