Permission for the installation of solar photovoltaic array to the existing roofs of a tram depot and sanding shed, located within a solar safeguarding zone (SSZ), that will measure greater than 300 sqm in area and include all ancillary works and services.
Planning precedent report
Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.Planning precedent report
Luas Broombridge - Hamilton Deport, 7 Broombridge Road, Cabra West, Dublin 7, D07 A978
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
13% of nearby decided applications were refused. The preview found 8,924 nearby planning records within 5 km where a location match is available.
- Matched source
- 4295/23
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
Open preview
Nearest similar decisions
Planning Permission for Alterations to existing hip roof to side to create a Gable roof to accommodate attic stairs to allow conversion of attic into non habitable storage with Dormer to rear, removal of chimney to side, window to side gable, Roof windows to front, modification to porch roof and proposal for extended vehicle access all with associated ancillary works.
The development will consist of alterations to existing front garden boundary and pedestrian gateway and creation of new vehicular entrance 3.5m wide with off-street parking space, new gates and all associated site, landscaping works and services.
Planning permission for construction of a single storey extension and entrance canopy to the front, new vehicular entrance, gates and dished footpath to the front and all associated site works.
RETENTION: application for retention permission for additional window to front elevation to first floor bathroom and widened vehicular access
PERMISSION: A temporary 5 year permission. The proposed development comprises the temporary change of use of part of the existing building from food production and storage to use as a microbrewery for the production of beer. Proposed internal and external works to facilitate the change of use include the construction of ramps and steps for personal and delivery access; the creation of a new ope in the northern elevation for personal access; and, internal works and fit out consisting of the removal of internal walls and the installation of brewhouse and fermentation plant, ancillary brewers lab, canteen and brewer's office, and WC facilities, and all associated development and works.
The full report covers all 8,924 decisions within 5km — with the planner's exact reasons, verbatim quotes and policy citations — delivered as a PDF. €49 incl. VAT.
Source match
Matched from public planning record 4295/23The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.
Included in full report
Policy and design risk
Included in full report
Source document extracts
Included in full report
Comparable decision table
Included in full report