The development will consist of the following modifications: 1. North-West Elevation - two existing windows are to be consolidated into one larger window, new external signage, installation of a new entrance door and canopy. 2. North-East Elevation - the creation of two new windows, two new access doors and the installation of a new external security shutter system, along with all associated ancillary site and development works.
Planning precedent report
Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.Planning precedent report
Adjoining site of Unit 5, Goldenbridge Industrial Estate, Inchicore, Dublin 8
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
13% of nearby decided applications were refused. The preview found 9,891 nearby planning records within 5 km where a location match is available.
- Matched source
- 4347/19
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
No reasons on record yet
Open preview
Nearest similar decisions
PERMISSION: For an extension to the southwest side of the existing unit for the provision of an ambulant disabled staircase providing accessibility from ground floor level to first floor level and a ramped access route and other ancillary works.
A change of use from a detached single storey storage shed to a detached single storey commercial cafe unit situated to the side of existing commercial premises.
RETENTION planning permission for a change of use to the forecourt area to unit 4a Goldenbridge Industrial Estate, for a mobile food & coffee truck with outdoor seating area.
RETENTION:The development will consist of: Retention planning permission for a change of use to forecourt area to unit 4a Goldenbridge Industrial Estate, for a mobile food & coffee truck with outdoor seating area
RETENTION / PLANNING PERMISSION: RETENTION permission for (i) the change of use of the site from 'restaurant car park' use to 'sports facility and recreational' use; (ii) removal of a 0.75m high boundary wall; (iii) installation of 5 no. sauna units and 3 no. plunge pools; (iv) installation of male and female changing rooms, office, and WC; (v) exterior signage; and PLANNING permission for (vi) provision of a new pedestrian crossing and associated road markings; (vii) provision of a 1.5m wide footpath along the site accessway; (viii) provision of covered bicycle parking comprising 10 no. bicycle parking spaces; (ix) reallocation of 4 no. existing car parking spaces for the proposed development; and (x) all associated site works, including public lighting to facilitate the development. Permission is also sought for (xi) the omission of Condition 4(a) as attached to Reg. Ref. 2555/18.
The full report covers all 9,891 decisions within 5km — with the planner's exact reasons, verbatim quotes and policy citations — delivered as a PDF. €49 incl. VAT.
Source match
Matched from public planning record 4347/19The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.
Included in full report
Policy and design risk
Included in full report
Source document extracts
Included in full report
Comparable decision table
Included in full report