Free preview / €39 incl. VAT site brief

Site planning risk brief

Fix the brief to an Eircode, a dropped pin or a drawn site boundary. PlanIntel then checks the planning register, available spatial layers, appeals and current indexed policy evidence.
See sample PDF

Define the land to check

The report your architect will ask for — here is how it compares with a €49 pre-planning report.
PlanIntel briefPlanningCheck
Price€39 incl. VAT€49
Nearby decisionsUp to 80 detailed (40 refusals + 40 grants)Not stated
AI planning chat5 messages/day freeNone
Saved-site alertsFreeNone
Tolka Quay Road, Dublin Port, Dublin 1Opens secure checkout for the €39 incl. VAT site risk brief. Promotion codes can be entered at checkout.
€39 incl. VAT once-off PDF, no account required
Refund requests are reviewed under the published refund policy
Derived from public planning records and linked source documents
PlanIntelSite risk brief preview

Site planning risk brief

Tolka Quay Road, Dublin Port, Dublin 1

One-off house / within 5 km where a location match is available

Preview

Local planning pattern

12% of nearby decided applications were refused. The site check found 11,839 decisions within 5 km, 1 exact-site or onsite candidate record, and 1621 structured appeals.

Matched source
4353/22
Project type
One-off house
Coverage
5 km radius

What this site brief can substantiate today

Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.

Applications tied to the site

Partial coverage

1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.

1 matched

Zoning and settlement

Partial coverage

1 of 2 layers are loaded for Dublin City Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.

1 matched

Rural-housing policy

Not yet covered

No verified rural-housing citation is loaded for Dublin City Council, so this brief makes no current policy claim and relies on decision history.

Flood, heritage, ecology and archaeology

Partial coverage

2 of 4 layers are loaded for Dublin City Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.

2 matched

Access, road and wastewater prompts

Partial coverage

0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.

Structured appeal history

Confirmed coverage

1621 structured nearby appeal records.

1,621 matched

Current policy citations

Confirmed coverage

Citations are current-dated and carry policy name, section, page and source URL from the Dublin City Council development plan.

1 matched
11,839Nearby applications
1Site-linked candidates
12%Nearby refused
1,621Structured appeals

Top refusal reasons nearby

No reasons on record yet

More refusal reasons are being processed from public planning records.

Nearest planning decisions

4353/22

The development will consist of the continuance of use of a 100m long 6.5m wide single lane bridge with access ramps over the M50 and a storage area for imported cars and vans and all associated site development and service works as permitted under planning reg. ref. 2495/17 and reg. ref. 3788/11.

Granted0.0 km22 May 2023
WEB1553/22

RETENTION: Retention of ventilation flue, grill and all associated works to rear of property

Granted0.1 km03 August 2022
3241/21

Retention planning permission for the development which it is proposed to retain is as follows: new opening in party wall between Units 7 and 8 with associated access ramp in Unit 8 and amalgamation of Unit 7 and 8

Granted0.1 km16 September 2021
4327/19

RETENTION: Retention planning permission of the existing uses of Units 2, 7, 9, 13, 14, 15, 17 and 19 at the Docklands Innovation Park, 128-130 East Wall Road, Dublin 3. The proposed development seeks retention of the existing uses on site as follows: Unit 2 and 7: Cultural/Recreational use (Dance Studio) Unit 9: Office use Unit 13: Gym at ground floor level and office use at 1st and 2nd floor level Unit 14: Educational use (Language School) at ground floor level and office use at 1st and 2nd floor level Unit 15: Warehouse at ground floor level Unit 17: Cultural/Recreational use (Dance Studio) Unit 19: Office use

Granted0.2 km15 September 2020
WEB1473/25

The proposed development will consist of the change of use Building P8 from office use to medical use (GFA: 3534 sq.m) and is described on a level-by-level basis as follows: Ground Floor: 3no. Physiotherapy rooms, Office Reception, 3no. Offices, Entrance Lobby (incl. Waiting area and Reception), Staff Room, Storage room, First Aid room, 2no.Staff Showers, Kitchenette, and all ancillary accommodation; First Floor: 7no. Consulting rooms, Treatment room, 2no. Utility rooms, Interview room, 4 no. Stores, 2no. Offices, Staff Kitchen/Lounge, Reception/ Admin room, Breakout space, and all ancillary accommodation; Second Floor: 8no. Consulting rooms, Treatment room, Reception, 4no. Offices, Interview room, 2no. Utility rooms,3no. Stores, Comms/IT room, Hot desking, and all ancillary accommodation; Third Floor: 8no. Consulting rooms, Treatment room, Reception, 5 no. Offices, 2no. Utility rooms, 3no. Stores, Comms/IT room, Staff Kitchen Lounge, and all ancillary accommodation; Fourth Floor: 3no. Research Labs, 6no. Offices, IT Hub, Waiting area, Teaching space/Meeting room, 2no. Utility rooms, Staff Kitchen Lounge, and all ancillary accommodation; Fifth Floor: 3no. Research Labs, 2no. Utility rooms, 4no. Offices, Reception, Store, Waiting area, and all ancillary accommodation; The proposal involves modifications to the internal layout of the Building P8 building consisting of 6 floors, to facilitate this change of use from office space to medical use. Minor alterations to the external façade of the southern elevation of the building are proposed to facilitate the change of use. The proposed development involves the reconfiguration of the existing parking arrangements to facilitate an increase in the number of spaces available from 30no. to 34no. spaces (includes the provision of 2no. accessible parking spaces) and increase in bicycle parking spaces from 48no. to 60no. spaces. Planning permission is also sought for the creation of a pedestrian linkage on the western side of the building for accessibility to the car parking area, installation of new Perspex cover over the existing Bike racks and all ancillary site services and site development works.

Granted0.2 km01 May 2025
WEB5545/25

PERMISSION AND RETENTION: We, EWR Innovation Park Limited, intend to apply for retention permission and planning permission for development at Unit 13 and Unit 14, Docklands Innovation Park, 128-130 East Wall Road, Dublin 3. The development will consist of: - Retention permission is sought for the change of use of Unit 13 at first floor level from office use to gym use; and Planning permission is sought for the change of use of Unit 14 from office use to educational and/or office use at first and second floors.

Granted0.2 km18 December 2025

The brief summarizes the pattern across all 11,839 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.

The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.

Exact site history and boundary checks

Site brief

Policy and mapped constraints

Site brief

Appeals and comparable decisions

Site brief

Deterministic risk prompts

Site brief
Ready to get the site risk brief?€39 incl. VAT once-off PDF, no account required