Free preview / €49 incl. VAT full PDF

Planning precedent report

Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.
See sample PDF
Opens secure checkout for the €49 incl. VAT full PDF report.Have a code? Enter it at checkout.
€49 incl. VAT once-off PDF, no account required
Refund requests are reviewed under the published refund policy
Derived from public planning records and linked source documents
PlanIntelPlanning precedent preview

Planning precedent report

12, Meath Square, Dublin 8, D08 X0H2

One-off house / within 5 km where a location match is available

Preview

Local planning pattern

13% of nearby decided applications were refused. The preview found 12,995 nearby planning records within 5 km where a location match is available.

Matched source
4355/19
Project type
One-off house
Coverage
5 km radius
12,995Nearby applications
13%Refused
11,318Conditional grants
3Refusal reasons

Top refusal reasons nearby

Design1
Procedure Invalid1
Residential Amenity1

Nearest similar decisions

4355/19

Planning permission is sought for the demolition of existing extension, construction of a new single storey extension, new dormer window and roof light to the rear.

Granted0.0 km18 December 2019
3669/23

RETENTION: Permission for change of use and sub-division from Cafe/Restaurant takeaway to 2 no. sub divided takeaway units with 2 no. signage for each, all with associated ancillary works.

Refused0.1 km26 June 2023
4170/23

RETENTION: Retention planning permission for single storey extension to rear of existing house with ancillary works.

Granted0.1 km11 September 2023
3858/21

RETENTION planning permission for single storey extension to side and replacement of door to first floor at side elevation with window.

Granted0.1 km14 January 2022
WEB5136/25

Permission is sought by Focus Housing Association CLG for development at Nos. 28-34 Braithwaite Street and Nos. 63-66 Pimlico, Dublin 8 (bounded by No. 35 Braithwaite Street to the east and north, Nos. 61 and 62 Pimlico to the north, Braithwaite Street/Poole Street Playground to the west, and by St. Margaret’s Avenue and St. John’s Avenue to the south). The development will consist of the construction of a residential development of 49 no. apartments set over two blocks (connected at ground floor level) ranging from 1-6 storeys in height and consisting of 10 no. studios, 9 no. 1 bed units, 11 no. 2 bed (3-person) units and 19 no. 2 bed (4-person) units, with all apartments provided with private balconies/terraces to north, south, east and west elevations; bin store, plant room, maintenance and store rooms; 1 no. ESB substation; 107 no. bicycle parking spaces (79 no. spaces within bicycle stores at ground floor level and 28 no. spaces within communal courtyard; landscaping including recreational, exercise and play equipment; lighting; boundary treatments; upgrades to existing footpaths with new pedestrian gate to St. Margaret’s Avenue (emergency access/egress only); heat pumps and PV panels at roof level; and all associated engineering and site works necessary to facilitate the development.

Granted0.1 km06 November 2025
3548/20

Planning permission for development on a site of 1,764sqm approximately (c.0.18ha) at Nos. 28-34, Braithwaite Street and Nos. 63-66 Pimlico, Dublin 8. The development will consist of the provision of a residential apartment scheme with a gross floor area of c.4,327 in 2no. blocks, each with separate street access via private entrance lobbies from Braithwaite Street and Pimlico, respectively; an overall height of 6 storeys above ground level (with screened and setback rooftop plant) comprising 49no. residential apartments (consisting of 6no. studio apartments, 14no. one-bedroom apartments and 29no. two-bedroom apartments); private amenity space in the form of ground level courtyard terraces and upper level balconies; communal amenity space in the form of a centrally located courtyard and open space area near the southwest corner of the site (482sqm approx. in total) each with dedicated children play areas; and 103 no. cycle parking spaces. The overall development will also include: a new ESB substation; piped infrastructure and ducting; hard and soft landscaping; changes in level; boundary treatments; pedestrian circulation areas and footpaths; drainage works; provision of bio-diverse roofs for assisting with drainage attenuation; communal refuse storage areas; and all associated site development and excavation works above and below ground.

Granted0.1 km24 March 2021

The full report covers all 12,995 decisions within 5km — with the planner's exact reasons, verbatim quotes and policy citations — delivered as a PDF. €49 incl. VAT.

The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.

Policy and design risk

Full PDF

Source document extracts

Full PDF

Comparable decision table

Full PDF

Submission strategy

Full PDF
Ready to generate the full report?€49 incl. VAT once-off PDF, no account required