Free preview / €39 incl. VAT site brief

Site planning risk brief

Fix the brief to an Eircode, a dropped pin or a drawn site boundary. PlanIntel then checks the planning register, available spatial layers, appeals and current indexed policy evidence.
See sample PDF

Define the land to check

The report your architect will ask for — here is how it compares with a €49 pre-planning report.
PlanIntel briefPlanningCheck
Price€39 incl. VAT€49
Nearby decisionsUp to 80 detailed (40 refusals + 40 grants)Not stated
AI planning chat5 messages/day freeNone
Saved-site alertsFreeNone
Mount Temple Comprehensive School, Malahide Road, Clontarf. Dublin 3Opens secure checkout for the €39 incl. VAT site risk brief. Promotion codes can be entered at checkout.
€39 incl. VAT once-off PDF, no account required
Refund requests are reviewed under the published refund policy
Derived from public planning records and linked source documents
PlanIntelSite risk brief preview

Site planning risk brief

Mount Temple Comprehensive School, Malahide Road, Clontarf. Dublin 3

One-off house / within 5 km where a location match is available

Preview

Local planning pattern

11% of nearby decided applications were refused. The site check found 10,450 decisions within 5 km, 1 exact-site or onsite candidate record, and 1266 structured appeals.

Matched source
4498/19
Project type
One-off house
Coverage
5 km radius

What this site brief can substantiate today

Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.

Applications tied to the site

Partial coverage

1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.

1 matched

Zoning and settlement

Partial coverage

1 of 2 layers are loaded for Dublin City Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.

1 matched

Rural-housing policy

Not yet covered

No verified rural-housing citation is loaded for Dublin City Council, so this brief makes no current policy claim and relies on decision history.

Flood, heritage, ecology and archaeology

Partial coverage

2 of 4 layers are loaded for Dublin City Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.

2 matched

Access, road and wastewater prompts

Partial coverage

0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.

Structured appeal history

Confirmed coverage

1266 structured nearby appeal records.

1,266 matched

Current policy citations

Confirmed coverage

Citations are current-dated and carry policy name, section, page and source URL from the Dublin City Council development plan.

1 matched
10,450Nearby applications
1Site-linked candidates
11%Nearby refused
1,266Structured appeals

Top refusal reasons nearby

Zoning Contravention4
Residential Amenity2
Other1
Traffic Sightlines1
Visual Amenity1

Nearest planning decisions

4498/19

PROTECTED STRUCTURE: The development will consist of: the construction of a new predominantly 3 storey 1000 pupil Post Primary School building, with roof mounted photovoltaic panel arrays, an external store; an ESB substation and switchroom, 47 car parking spaces to the north and 25 car parking spaces to the south of the proposed building, new site lighting and associated ancillary hard and soft landscaping works. The development will include the demolition of 6 no. existing buildings on the site; 5 no. of which are currently in use by the school. All will be demolished on a phased basis to accommodate the development. The development is located within the curtilage of Mount Temple Lands upon which there are 3 no. Protected Structures - Mount Temple House, its Clocktower and the Gate Lodge. No works are proposed for these Protected Structures. Gross internal floor space of the proposed development is 10,685sqm; all on a site of 9.49 hectares.

Granted0.0 km24 January 2020
3547/24

The development will consist providing off-street parking in the front garden,creating a 2.6 metre entrance opening in the front wall, dishing the public foothpath at the front of the dwelling and associated site and storm drainage works.

Granted0.2 km23 July 2024
WEB1139/22

PERMISSION & RETENTION: Permission and Retention permission sought for the following development: (A) Proposed one + two storey extension to rear and side incorporating conversion of part of existing garage to side (B) Proposed first floor window in lieu of existing landing window to south east side of dwelling (C) Retention & completion of widened vehicle entrance.

Granted0.2 km14 April 2022
3185/22

RETENTION: Retention of single storey flat roofed detached store in rear garden.

Granted0.2 km25 March 2022
3400/20

Permission to construct single storey detached Playroom and Store in rear garden, and, to widen existing front vehicular entrance.

Granted0.2 km12 November 2020
2136/21

Planning permission for development will consist of: (a) demolition of the existing garage structure, existing single storey structure to the rear of the dwelling and 2 no. existing chimneys to the existing side roof-slope, (b) construction of a new two storey extension to the side of the existing house with pitched roof (c) construction of a new dormer to the existing rear roof-slope with associated attic conversion (d) constructcion of single storey extension to the rear of the existing house, (e) all associated internal and external alterations, site, landscaping, drainage and ancillary works.

Granted0.2 km29 March 2021

The brief summarizes the pattern across all 10,450 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.

The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.

Exact site history and boundary checks

Site brief

Policy and mapped constraints

Site brief

Appeals and comparable decisions

Site brief

Deterministic risk prompts

Site brief
Ready to get the site risk brief?€39 incl. VAT once-off PDF, no account required