Development consists of 1st floor bedroom extension over existing garage.
Planning precedent report
Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.Planning precedent report
34, Cabra Drive, Dublin 7
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
13% of nearby decided applications were refused. The preview found 11,015 nearby planning records within 5 km where a location match is available.
- Matched source
- 4528/19
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
No reasons on record yet
Open preview
Nearest similar decisions
To narrow the existing front garage door, render the existing brick front façade of the garage, build a new first floor extension to the side; and associated site works
The development will consist of; 1. demolition of single storey extension to the rear of the dwelling which abuts No.50 Cabra Drive's rear extension. 2. demolition of garage roof which abuts No.50 Cabra Drive. 3. demolition of the boiler house which abuts a similar structure on No. 52 Cabra Drive.
A 1 storey to rear & 2 storey to side extension, to provide dining, sitting, kitchen at ground level, 2 bedrooms at first floor. Works include minor internal alterations, modifications to front, side, rear elevations, 6 no. velux to rear, attic conversion to store & all associated site development works.
Construction of a 77 sq.m Family Flat to the rear of existing dwelling.
The construction of a single storey (24sq.m.) domestic extension to the rear (north) of 50 Old Cabra Road, Dublin 7.
The full report covers all 11,015 decisions within 5km — with the planner's exact reasons, verbatim quotes and policy citations — delivered as a PDF. €49 incl. VAT.
Source match
Matched from public planning record 4528/19The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.
Included in full report
Policy and design risk
Included in full report
Source document extracts
Included in full report
Comparable decision table
Included in full report