The proposed development comprises the erection of the roof mounted PV panels at rooftop level on the Smurfit Building at Beaumont Hospital, comprising a total array of 693 sq.m of PV panels, including a vertically mounted array of 45 sq.m of PV panels to the southern elevation of the rooftop plant room.
Planning precedent report
Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.Planning precedent report
RCSI Education and Research Centre, Smurfit Building, Beaumont Hospital, Dublin 9
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
9% of nearby decided applications were refused. The preview found 6,916 nearby planning records within 5 km where a location match is available.
- Matched source
- 4631/23
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
No reasons on record yet
Open preview
Nearest similar decisions
The proposed development comprises the following: Provision of three- storey building, to provide an endoscopy unit (GFA: 4,132 sq.m) comprising 18 no. patient rooms, 7 no. treatment rooms, 2 no. recovery rooms, office and staff facilities, decontamination unit, stairs and lift core, store and overhead plant rooms and includes for a green roof; Provision of roof mounted solar array (129 sq. m); Removal of the existing carpark comprising of 70 no. car parking spaces and 6 no. accessible car parking spaces to facilitate development with the provision of 3 no. accessible parking spaces (net loss of 73 no. car parking spaces); • Alterations to façade of adjoining hospital building to facilitate linkage; Provision of 60 no. bay enclosed bike store (GFA: 69 sq. m), Provision of landscaping, boundary treatments and all associated development works and services ancillary to the proposed development.
Permission for development at the site of Beaumont Hospital, Beaumont Road, Dublin 9 for: Critical Electrical Infrastructure Upgrade Including Alterations and/or Extension to 5 No. Existing Substations, and Alterations and First Floor Extension to TSD Building at Beaumont Hospital, Beaumont Road, Dublin 9, DO9V2NO. Gross development floor area of new-build elements will be 1118m2.
Erect a two storey domestic extension and ancillary site works at the rear and two new windows at ground floor in the side gable and new dished pavement in the public footpath for the existing off-street parking and drive-in at the front.
Two number new bike storage units to be located at two separate locations within the Beaumont hospital campus, one to the north-east of the Ashlin Centre and one adjoining an existing surface level car park to the east of the Trim Road entrance. Each bike storage unit will be an enclosed, covered single-storey structure with racks to accommodate 56 no. bikes and additional, dedicated space for parking cargo bikes. The gross development floor area of the new build elements will be 138 sq.m.
The development will comprise of a single-storey temporary modular unit for Emergency Department patient use (c. 104 sq. metres) at lower ground floor level at internal courtyard no.2, to the East of the existing emergency department. The proposed unit will provide a dedicated treatment space for frail elderly patients attending the Emergency Department.
Source match
Matched from public planning record 4631/23The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.
Included in full report
Policy and design risk
Included in full report
Source document extracts
Included in full report
Comparable decision table
Included in full report