PERMISSION: The Development Will Consist of The Installation of An 18m Telecommunications Support Structure Carrying Antennas, Remote Radio Units (RRU'S), GPS Beacon And Associated Equipment, Together With Ground-Based Equipment, Cabinets And All Associated Site Development Works. The Development Will Provide High Speed Wireless Data and Broadband Services.
Planning precedent report
Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.Planning precedent report
Open Eir Exchange, River Road, Pelletstown, Dublin 15
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
12% of nearby decided applications were refused. The preview found 6,184 nearby planning records within 5 km where a location match is available.
- Matched source
- 4643/23
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
Open preview
Nearest similar decisions
The development will consist of the construction of a three storey, split level school building, Pelletstown ETNS (RN 20392I). It will facilitate a 16 classroom primary school with a two classroom Special Needs unit. The design also includes a general purpose hall, support teaching spaces and ancillary accommodation. The proposed school will be three storeys with a single storey element and a roof top play space. The school also incorporates a rooftop play space, ground floor external play areas and special needs unit play-spaces and an external ball court. There will also be associated car parking, bicycle shed, access road, landscaping, connection to public services and all associated siteworks.
Permission for an attic conversion to a non-habitable storage space with roof windows to front of existing house and ancillary works.
The development will consist of the construction of a part 2-storey, part single-storey prefabricated temporary school comprising of 12 classrooms and an administration block. The works will include a temporary carpark, bike parking, landscaping and associated boundary treatments. The Temporary School is for a maximum period of 2 years while the permanent Educate Together National School (RN203921) (granted under P0354) is constructed.
Construction of single storey extension to the side and rear of existing dwelling comprising of kitchen and dining room and all associated site works.
Proposed works include conversion of the existing garage space into a ground floor bedroom and utility room. Replacement of the existing garage door with 2 new windows to match the properties existing window scheme and a one storey extension with a floor area of 10.9 sq.m to the rear of the property to be used as a playroom. Plus all associated site works.
The full report covers all 6,184 decisions within 5km — with the planner's exact reasons, verbatim quotes and policy citations — delivered as a PDF. €49 incl. VAT.
Source match
Matched from public planning record 4643/23The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.
Included in full report
Policy and design risk
Included in full report
Source document extracts
Included in full report
Comparable decision table
Included in full report