PERMISSION:The development will consist of building an end-of-terrace 2-storey house to the side of the existing dwelling at 20 Belcamp Crescent, with new vehicular access from Belcamp Crescent and all associated site and drainage works.
Planning precedent report
Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.Planning precedent report
20 Belcamp Crescent, Priorswood, Dublin 17
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
8% of nearby decided applications were refused. The preview found 5,630 nearby planning records within 5 km where a location match is available.
- Matched source
- 4676/23
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
Open preview
Nearest similar decisions
The development will consist of (i) building an end-of-terrace one-storey house to the side of the existing dwelling. (ii) providing a new vehicular entrance to th front of 31 Belcamp Crescent, Dublin 17 with access from Belcamp Crescent and (iii) all associated site and drainage works.
Development will consist of a proposed new ground floor only extension to the front of the existing house and all ancillary works.
RETENTION Planning for retention of single storey portacabin extension to single storey portacabin-type structure for use as a senior centre and associated site works.
RETENTION: Of a single storey portacabin-type structure for use as a senior centre,and associated site works.
The development will consist of demolishing existing garage to the side of the existing house and building a new ground floor only extension to the side of the existing house and all ancillary works.
The full report covers all 5,630 decisions within 5km — with the planner's exact reasons, verbatim quotes and policy citations — delivered as a PDF. €49 incl. VAT.
Source match
Matched from public planning record 4676/23The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.
Included in full report
Policy and design risk
Included in full report
Source document extracts
Included in full report
Comparable decision table
Included in full report