The development will consist of the subdivision and reduction of existing approved retail unit to form 2 units with a change of use to restaurant use (282 sqm)) with new escape route to rear 95E with external plant deck over (59 sqm), with residual space being retained as retail, retail storage use (262 sqm) and ancillary associated modifications to existing front (North North-East) and side (South South-East) elevations and other ancillary associated works.
Planning precedent report
Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.Planning precedent report
Unit Known As 95D, Omni Park Shopping Centre, Swords Road, Santry, Dublin 9
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
10% of nearby decided applications were refused. The preview found 7,092 nearby planning records within 5 km where a location match is available.
- Matched source
- 4683/19
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
Open preview
Nearest similar decisions
The development will consist of external and internal works, including the following: a) external works comprising of the development of new signage, including illuminated built up lettering; b) internal works, including the removal of existing shop signage, the installation of internally illuminated fascia return panels, the installation of internal security roller shutters, and the installation/development of a new mezzanine retail floor ( c. 230 sqm) increasing the size of the retail unit from c. 523 sqm to c. 753 sqm). The development also includes all associated site works and services above and below ground.
The proposed development will consist of the change of use from existing retail (unit49/50) and amusement use (units 50A/76/91/92 & 92A) to restaurant use on the ground floor (units 49/50/50A/76) and change of use on the 1sr floor (units 91, 92 & 92A) to office use. Removal of the existing brick and render façade (including timber shopfronts) to be replaced with a new stone and glazed façade (to match the existing adjoining building 95) with associated minor site works at Omni Park Shopping Centre.
The proposed development will consist of the following works at ground floor level: Change of Use of Units 24,24A, 48, 48A, 72 and 73 from fast food restaurant to medical services centre (378 sq m) and retail unit (115 sq m); Change of use of Unit 48 from retail use to restaurant / café use for the sale and preparation of hot food for consumption on and off the premises (146 sq m). The proposed development will also consist of the following works at first floor level: Change of Use of Unit 24A from fast food restaurant to office use (425 sq m) The application includes associated internal reconfiguration works within the existing units to include removal of roller shutters & fascia panel to the mall area, the installation of new glazed shop front to the internal mall area and façade facing Car Park 2, associated signage, and all associated site works on an area of 0.072ha.
CHANGE OF USE: The development will consist of: change of use of Unit 48 from restaurant café to hot food takeaway shop with home delivery service. (151.4 sq. m) including associated internal works extract ventilation new shopfront and fascia mounted illuminated signage.
The proposed development comprises, demolition of existing single storey extension and boiler room to rear (north) of existing dwelling and construction of a single storey extension of 37 sq.m. with a flat roof profile and 3 no. rooflights to rear (north) of existing dwelling, internal alterations, and associated elevation changes, landscaping and site works.
The full report covers all 7,092 decisions within 5km — with the planner's exact reasons, verbatim quotes and policy citations — delivered as a PDF. €49 incl. VAT.
Source match
Matched from public planning record 4683/19The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.
Included in full report
Policy and design risk
Included in full report
Source document extracts
Included in full report
Comparable decision table
Included in full report