Applications tied to the site
Partial coverage5 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
5 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
13% of nearby decided applications were refused. The site check found 13,178 decisions within 5 km, 5 exact-site or onsite candidate records, and 2767 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
5 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
5 matched1 of 2 layers are loaded for Dublin City Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedNo verified rural-housing citation is loaded for Dublin City Council, so this brief makes no current policy claim and relies on decision history.
2 of 4 layers are loaded for Dublin City Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
2767 structured nearby appeal records.
2,767 matchedCitations are current-dated and carry policy name, section, page and source URL from the Dublin City Council development plan.
1 matchedOpen preview
Open preview
The development will consist of an increase in floor area of the existing office building by providing lateral (to the east and west) and vertical extensions comprising; the lateral extension of the block (from part basement/part undercroft level to fifth floor level) by 6,702 sq m and the vertical extension of the block (provision of a new set back part sixth and seventh floor level) by 2,383 sq m providing an overall height of 8 No. storeys over part basement/part undercroft; replacement of all façades; and internal modifications and reconfigurations. The proposed development will result in an increase in office floor area from 7,093 sq m to 16,178 sq m. The development also includes: the reconfiguration of existing car park layout resulting in a reduction of 17 No. car parking spaces providing a total of 61 No. car parking spaces; bicycle parking: recessed balconies and roof terraces facing all directions; green roof, hard and soft landscaping; substations; generators; plant; photovoltaic panels; boundary treatments and all associated site development works above and below ground.
10 year permission for development on a 1.38 Ha site at Nos. 1-3 Ballsbridge Park, Dublin 4. The development will consist of an increase in floor area of the existing 3 No. office buildings by providing lateral (to the east and west) and vertical extensions comprising: the lateral extension of Block 1 (from basement to fourth floor level) by 5,958 sq.m and the vertical extension (provision of a new set back part fifth floor level) by 1.555 sq.m; the lateral extension of Block 2 (from basement to fifth floor level) by 6.876 sq.m and the vertical extension (provision of a new set back part sixth floor level) by 1,264 sq.m; the lateral extension of Block 3 (from basement to fifth floor level) by 6,052 sq.m and the vertical extension (provision of a new set back part sixth floor level) by 1,201 sq.m; replacement of all facades of Block Nos. 1-3 and internal modifications and reconfigurations. The proposed development will result in an increase in office floor area from 19,696 sq.m to 42,602 sq.m. The development also includes: the reconfiguration of existing car park layout resulting in a reduction of 27 No. car parking spaces providing a total of 174 No. car parking spaces; provision of 408 No. cycle parking spaces; recessed balconies and roof terraces facing north, south, east and west; green roofs; hard and soft landscaping; 3 no. substations, generators; plant, photovoltaic panels; boundary treatments and all associated site development works above and below ground.
The development will consist of: -The demolition of existing 5-storey, 4,105 sq.m structure on site (formerly known as Zurich House) and the construction of an 8-storey over basement office building of c. 19,154 sq.m. The building will contain a double height entrance reception area at ground floor and set back upper floors and terraces. -The basement access/ egress is via ramp from Ballsbridge Park. The basement will contain 44 no. car parking spaces, 3 no. of these are accessible, 276 no. bicycle parking spaces, 6 no. cargo/ non-standard bike spaces and 22 no. scooter spaces. Changing rooms/ showers, gym, bin stores, plant and attenuation tank are also contained within the basement. -Green roof, solar panels, ESB substation, landscaping works and a new service access road onto Ballsbridge Park at the north of the site are proposed to be incorporated into the scheme.
Demolition of an existing single storey extension and derelict out-buildings and the construction of a proposed two storey extension to the rear of the existing semi-detached dwelling house. The proposed extension consists of a kitchen and WC at ground floor level and study at first floor level, bounded by Ballsbridge Avenue and Ballsbridge Park. The works will also include internal alterations and installation of rooflights (3 no.) on the rear pitch of the existing.
The development will consist of the construction of a first-floor rear view extension to an existing two storey, one-bed terraced dwelling-house
Permission to install a 1.42m x 0.51m x 1.8m (LxWxH) above ground enclosure, to house a new natural gas District Regulating Installation including a 3m high 'lamp post' style relief vent stack with all ancillary services and associated site works to replace the existing below ground natural gas regulating unit.
The brief summarizes the pattern across all 13,178 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 4729/22The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief