Planning permission for a 2-storey extension to the rear of the existing school building including 3 no. classrooms, 2 no. SET rooms with ancillary accommodation, removal of 2 no. existing pre-fab buildings and all associated site works.
Planning precedent report
Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.Planning precedent report
St. Fergal's Boys National School, Cappagh Road, Finglas West, Dubin 11
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
11% of nearby decided applications were refused. The preview found 5,392 nearby planning records within 5 km where a location match is available.
- Matched source
- 4795/23
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
Open preview
Nearest similar decisions
The construction of a single storey Granny Flat extension to the side of existing house. The works will incorporate the conversion of the existing garage into habitable accommodation and a single storey extension to the side.
PERMISSION AND RETENTION: Attic conversion for storage with dormer window to the rear and dormer window to the front. Two Velux windows to the front roof area. Rear shed for retention. New gable side window. Rear single-story extension. Front single storey extension with roof window.
RETENTION: Retention of a single storey shed in the rear garden area, used for domestic purposes.
Planning permission for a. Single storey playroom/shed to rear, b. All associated site works to rear.
The development will consist of (1) New 2 storey detached 3 bedroom house. (2) New boundary walls. (3) New vehicular access. (4) Off street car parking. (5) Associated site works.
The full report covers all 5,392 decisions within 5km — with the planner's exact reasons, verbatim quotes and policy citations — delivered as a PDF. €49 incl. VAT.
Source match
Matched from public planning record 4795/23The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.
Included in full report
Policy and design risk
Included in full report
Source document extracts
Included in full report
Comparable decision table
Included in full report