Applications tied to the site
Partial coverage9 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
9 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
13% of nearby decided applications were refused. The site check found 11,441 decisions within 5 km, 9 exact-site or onsite candidate records, and 2060 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
9 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
9 matched1 of 2 layers are loaded for Dublin City Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedNo verified rural-housing citation is loaded for Dublin City Council, so this brief makes no current policy claim and relies on decision history.
2 of 4 layers are loaded for Dublin City Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
2060 structured nearby appeal records.
2,060 matchedCitations are current-dated and carry policy name, section, page and source URL from the Dublin City Council development plan.
1 matchedOpen preview
Open preview
Permission is sought for a two storey extension to the fore, side & rear of existing dwelling including amendments to all elevations, to be constructed in two phases, a new vehiclar entrance for off street parking with sliding metal gate, with ancillary site works.
RETENTION: Retention of existing single storey rear extension to existing two storey terraced house as constructed, retention of existing detached single storey shed located to the rear of existing terraced house and all associated site works.
RETENTION: The development will consist of: Retention of existing single storey rear extension to existing two storey terraced house as constructed, retention of existing detached single storey shed located to the rear of existing terraced house and all associated site works.
The development will consist of the following: (A) Demolition of several existing single storey extensions to the side and rear of the existing residence. (B) Removal of the existing front garden pillar to accommodate widening of vehicular access. (C) Construction of a part single storey, part two-storey extension to the side and rear. The ground floor extension will contain a kitchen, dining area, living room, utility and shower room. The first-floor extension will contain of a bedroom and shower room (D) Installation of new windows to the existing front and rear facades (E) Carrying out all necessary ancillary site work.
Planning permission is sought for the construction of new vehicular access off 6 Suir Road to allow access to new driveway. The works will include demolition of existing railings, hedges and pillars and construction of new pillars, gates and dished kerbing, relocation of road sign and all associated works.
Attic conversion for storage, including a rear dormer and two Velux windows on the front roof slope. Single-storey flat-roof extension to the rear.
The brief summarizes the pattern across all 11,441 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 4858/22The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief