The development will consist of: (a) the change of use from coffee shop use to restaurant use, (b) the removal of existing fascia signage while maintaining the existing signage zone, (c) all associated site works.
Planning precedent report
Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.Planning precedent report
Unit 2 Gandon House, Custom House Square, Mayor Street Lower, I.F.S.C., Dublin 1
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
12% of nearby decided applications were refused. The preview found 12,624 nearby planning records within 5 km where a location match is available.
- Matched source
- 4881/22
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
Open preview
Nearest similar decisions
Planning permission for development on a site of 0.34 ha at New Century House, Mayor Street Lower, IFSC, Dublin 1, D01 K8N7. The site is bound by Mayor Street Lower to the north, Citi Bank building fronting North Wall Quay to the south, and Clarion Quay apartment development to the east and Commons Street to the west. The proposed development comprises of the following: - Provision of 2 no. metal sign boards to the bank branch facade of the northern and eastern elevations; - Increase in width (c.475mm) and illumination of permitted totem sign; - Provision of double doors to replace single entrance door of the bank branch; - Installation of ATM on the northern elevation of the bank branch; - Provision of canopy sign with illuminated uplighting to the permitted office building.
Planning permission for development on a site of 0.34 ha at New Century House, Mayor Street Lower, IFSC, Dublin 1, D01 K8N7. The site is bound by Mayor Street Lower to the north, Citi Bank building fronting North Wall Quay to the south, and Clarion Quay apartment development to the east and Commons Street to the west. The proposed development comprises of the following: • Refurbishment of the existing 6 no. storey building to provide for a new façade treatment to all elevations. • Provision of new part double height reception space to the rear elevation. • Relocation of existing bank branch to the north east corner of the ground floor resulting in a change of use from office to bank in this area. • Reduction of the existing bank branch from 216sqm to 187sqm. • Change of use of former bank branch to office use at ground floor level (147 sqm). • Provision of new universally accessible pedestrian entrance to bank branch from street level along the northern elevation of the building. • Provision of refurbished entrance to the office development to the north elevation fronting Mayor Street Lower. • Provision of additional mechanical plant at roof level. • Minor infill to office floor plate at 5th floor level resulting in an increase of 79 sqm of office floor space overall. • Minor reconfiguration of internal office floor plates. • Reconfiguration of basement level to provide ancillary office amenities and additional bike parking spaces (195 no. spaces) and 49 carpark spaces including 7no. new electric car charge points and 3 no. new universally accessible parking bays. • Upgrade of the hard and soft landscaping within the courtyard area and provision of new canopy area to courtyard on the southern elevation and provision of new screen to courtyard along the southern boundary of the site. • Minor alternations to the hard landscaping to the north of the development fronting Mayor Street Lower. • The proposed development also includes accessible terraces at 5th floor level to the north, east and west, and all other associated site development works necessary to facilitate the development. The proposed development will result in an increase in gross floor area from 12,223 sqm to 12,365 sqm.
Permission for a wall-mounted barber's pole sign, approx. 800mm in height, to the front facade.
Planning permission for the development will consist of the removal of 3 car parking spaces at ground floor level and construction of a new stand alone single storey shower block accessed from the rear car park entrance to the building. The structure will contain 2 new male shower rooms, 2 female shower rooms and one disabled WC and shower room and a drying room. The entrance to the shower rooms will have an overhead canopy and planter box with integrated external lighting.
The development will consist of the installation of roof-mounted solar photovoltaic panels to include all ancillary works and services.
The full report covers all 12,624 decisions within 5km — with the planner's exact reasons, verbatim quotes and policy citations — delivered as a PDF. €49 incl. VAT.
Source match
Matched from public planning record 4881/22The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.
Included in full report
Policy and design risk
Included in full report
Source document extracts
Included in full report
Comparable decision table
Included in full report