Applications tied to the site
Partial coverage15 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
15 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
12% of nearby decided applications were refused. The site check found 10,729 decisions within 5 km, 15 exact-site or onsite candidate records, and 1284 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
15 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
15 matched1 of 2 layers are loaded for Dublin City Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedNo verified rural-housing citation is loaded for Dublin City Council, so this brief makes no current policy claim and relies on decision history.
2 of 4 layers are loaded for Dublin City Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
1284 structured nearby appeal records.
1,284 matchedCitations are current-dated and carry policy name, section, page and source URL from the Dublin City Council development plan.
1 matchedOpen preview
Open preview
Permission is sought for the demolition of the existing rear extension and the construction of a new two storey extension to the rear & side, the addtion of a small front entrance porch, enclosed shed along with a new vehicular entrance to the exsiting end of terrace house at 64 Walsh Road, Dublin 9, D09 P8N7.
Demolition of existing rear single storey extension and a construction of 2 storey rear extension; a single storey front porch extension; Creation of vehicular access to front
The development will consist of: A) The demolition of an existing single storey lean-to porch to the front elevation, B) The construction of a proposed new front entrance canopy with stepped entrance, C) The construction of a new single storey extension to the rear of the existing dwelling at ground floor level, D) The construction of a proposed rooflight to the rear roof slope of the existing dwelling, E) A proposed new window to the front elevation at first floor level, and F) all associated site works and services, including a proposed bin store to the front garden.
Planning permission is sought for the demolition of existing rear extension and the construction of a new single part two storey extension to the rear / side of the existing end of terrace house at 94 Walsh Road. The development also includes a new pedestrian access from the side laneway and all necessary site works to facilitate the proposed development.
Permission for development will consist of the construction of a sunroom to the rear and associated site works.
Planning Permission is sought for a new vehicular access driveway, involving the removal of front railings and all associated works including dishing of existing footpath.
The brief summarizes the pattern across all 10,729 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 4979/23The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief