Applications tied to the site
Partial coverage16 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
16 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
13% of nearby decided applications were refused. The site check found 10,936 decisions within 5 km, 16 exact-site or onsite candidate records, and 1870 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
16 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
16 matched1 of 2 layers are loaded for Dublin City Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedNo verified rural-housing citation is loaded for Dublin City Council, so this brief makes no current policy claim and relies on decision history.
2 of 4 layers are loaded for Dublin City Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
1870 structured nearby appeal records.
1,870 matchedCitations are current-dated and carry policy name, section, page and source URL from the Dublin City Council development plan.
1 matchedOpen preview
Open preview
Permission is sought comprising renovation and extension of the existing dwelling with works including (i) alterations to fenestration inclusive of the emission of 2 no. windows at first-floor level at the southern elevation to provide 1 no. larger window, enlarging 2 no. windows along the western elevation at ground and first floor levels and replacement of all with PVC/aluminium windows; (ii) alterations to the roof profile inclusive of the removal of 3 no. chimneys and addition of a small apex to the front of the structure; (iii) external insulation to be fixed to the exterior walls and new materials to comprise proprietary self-coloured render/sand cement or selected brick; (iv) construction of a part one part two-storey rear extension and associated reconfiguration of the internal layout of the structure; (v) alterations to front boundary treatment inclusive of widening the existing shared (vehicular and pedestrian) entrance to 3 metres and provision of a sliding gate and replacement of boundary wall with railings; (vi) construction of a shared surface to provide 2 no. car parking spaces, bicycle parking and a shed with 6.38 sq. internal floor area; (vii) all ancillary works inclusive of landscaping and boundary treatments necessary to facilitate the development. The proposed works will increase the number of bedrooms from 4 no. to 6 no.
Permission for development comprising: (i) Demolition of the existing two-storey dwelling house (157.5sq.m) on the site; (ii) Development of a residential scheme, totalling 4 no. residential houses (comprising 4 no. 3 bed, 3-storey houses). The development will be served by 18 no. bicycle parking spaces to be provided at surface level and 5 no. car parking spaces (including 1 no. mobility impaired user parking space). (iii) Associated site and infrastructural works are also proposed, which include: foul and surface water drainage, landscaping, boundary treatments, electric gate at site entrance and all associated site development works necessary to facilitate the development.
Planning permission to demolish an existing 2 storey detached dwelling and construct a terrace of 5 no. 3 bed 3 storey houses with single storey extensions to the rear on the 2 no. end of terrace houses, together with bin store, bike rack and new entrance wall and railings, including widening of the existing vehicular access/entrance, 6 no. car park spaces, landscaping and all with ancillary site works.
The proposed development will consist of the demolition of an existing single storey rear extension, two-storey bay window, existing side gate and outbuildings and the construction of a single-story extension to the rear and side of the building comprising; an extension to the teaching and meditation room, convivial community area (126m2), new entrance lobby to the side (14m2) with new stepped and ramped access, reconstruction of existing first floor bay window (2.6m2), alterations to existing front gate, and all associated site works
The proposed development will consist of the following: Proposed new 3 storey teaching and meditation building (356 sqm) containing (a) ground floor teaching space; (b) first floor 2 bed apartment; (c) second floor shrine room in the rear garden of the existing 2 storey over basement house. Also to include a revised location of existing site entrance on roadside boundary, removal of existing timber gates and wall at side of existing house and provision of new gates and driveway to rear garden area, conversion of existing single storey structure to rear of existing house for provision of sanitary facilities, provision of 10 covered bicycle parking spaces, new hard landscape, landscape planting, boundary treatments, services and all associated site works.
RETENTION: Permission for retention being sought for change of use from residential to meditation and practice space on ground floor.
The brief summarizes the pattern across all 10,936 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 5089/22The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief