Free preview / €49 incl. VAT full PDF

Planning precedent report

Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.
See sample PDF
Opens secure checkout for the €49 incl. VAT full PDF report.Have a code? Enter it at checkout.
€49 incl. VAT once-off PDF, no account required
Refund requests are reviewed under the published refund policy
Derived from public planning records and linked source documents
PlanIntelPlanning precedent preview

Planning precedent report

On the footpath on the Eastern side of Macken Street, Dublin 2. The site is located adjacent to 'Trinity Technology & Enterprise Campus' to the East and opposite Conway Court (Nos 1-30) to the West

One-off house / within 5 km where a location match is available

Preview

Local planning pattern

13% of nearby decided applications were refused. The preview found 12,670 nearby planning records within 5 km where a location match is available.

Matched source
5357/22
Project type
One-off house
Coverage
5 km radius
12,670Nearby applications
13%Refused
11,052Conditional grants
3Refusal reasons

Top refusal reasons nearby

Design1
Procedure Invalid1
Residential Amenity1

Nearest similar decisions

5357/22

The development will consist of the replacement of the existing scrolling internally illuminated double sided 'Metropole' advertising display case with a double sided digital advertising display case and associated works.

Granted0.0 km04 April 2023
WEB2127/22

A) removal of existing single-storey extension to rear of existing dwelling, and b) the construction of a two-storey extension to rear of existing dwelling, with rooflights, c) removal of existing stone finish to return front facade to original brick finish, and all associated site works.

Granted0.1 km16 February 2023
WEB1131/25

Permission is sought for an extension to a terraced dwelling. The development will consist of construction of an extension with a pitch roof at first floor level over an existing ground floor extension to rear, and 2no. velux rooflights to rear, and internal modifications.

Granted0.1 km19 March 2025
WEB2853/25

The development will consist of: The alteration and re-use of the existing former warehouse building at no 3 Grand Canal Quay to create a new digital library for Trinity College Dublin. Alteration of the existing building east gable to create a new entrance façade including glass windows and screens and backlit glazing elements, refurbishment and repair of the existing south elevation including upgrade or replacement of windows, alteration of west end of building and adjacent store workshop to create a new fire exit and service entrance. Existing roof to be retained but modified to provide additional roof top plant space, ventilation outlets and photovoltaic panels and upgrade of roof glazing and roof safety access systems. External paved areas to the front of the building on Grand Canal quay to be altered as part of the new entrance and interface with the paving to adjacent buildings. Internal floor and column structures to be removed and replaced with new structure to create 3 floors of open plan research and digital library space within the existing external envelope at basement, ground and mezzanine levels arranged around an internal void space or atrium.

Granted0.1 km05 December 2025
WEB1631/25

PROTECTED STRUCTURE Within the Curtilage of a protected structure. The development will consist of the creation of a defined location, within the existing approved hard landscape, for a changing art work/sculpture installation. The paved area, 8m x 4m in extent, will have in ground up-lighting for use when required in association with the installed art work. The art work will change on a regular basis and will vary in form.

Granted0.1 km23 July 2025
4560/22

PROTECTED STRUCTURE: The development will consist of: the following alterations to the previously granted PROTECTED STRUCTURE permission (3768/20) Deletion of works to the protected structure of the tower (no 5 Grand Canal Quay), Deletion of the covered walkway roof connecting the buildings, Adjustment to the landscape walls and steps across the site following the deletion of the walkway roof, Addition of the electricity substation within the rear boundary wall (west side of the garden courtyard), Removal of the existing brick archway (current pedestrian entrance to the site), Redesign of the external fire escape stair serving the small tower building in the garden courtyard area of no 4 Grand Canal Quay, The addition of the large window to north elevation of the top floor events space in the small tower, Adjustment to the design of the east facing window to the cafe space (in the modified existing garage door opening, Adjustment to the external courtyard area on Grand Canal Quay in front of the east gable of no 4 Grand Canal Quay (including adjustment of the two accessible parking spaces and the refuse store and minor alterations to the external door screens in the existing openings), Proposal to paint the existing brickwork of the east facing gables of the building (to unify the varying existing materials and finishes), Minor internal alterations within the layout of no 4 Grand Canal Quay.

Granted0.1 km20 September 2022

The full report covers all 12,670 decisions within 5km — with the planner's exact reasons, verbatim quotes and policy citations — delivered as a PDF. €49 incl. VAT.

The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.

Policy and design risk

Full PDF

Source document extracts

Full PDF

Comparable decision table

Full PDF

Submission strategy

Full PDF
Ready to generate the full report?€49 incl. VAT once-off PDF, no account required