Applications tied to the site
Partial coverage27 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
27 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
13% of nearby decided applications were refused. The site check found 13,798 decisions within 5 km, 27 exact-site or onsite candidate records, and 2630 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
27 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
27 matched1 of 2 layers are loaded for Dublin City Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedNo verified rural-housing citation is loaded for Dublin City Council, so this brief makes no current policy claim and relies on decision history.
2 of 4 layers are loaded for Dublin City Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
2630 structured nearby appeal records.
2,630 matchedCitations are current-dated and carry policy name, section, page and source URL from the Dublin City Council development plan.
1 matchedOpen preview
Open preview
Construction of new single storey utility/study/living room/wc extension to side and rear of existing dwelling and associated site works.
Permission for construction of a single storey extension with 2 no. rooflights to the side and rear.
Renovation to include first floor front extension and attic conversion involving extension of roof structure with dormer window to the rear and new front boundary fencing and gate
The development will consist of the installation of external insulation and associated render system to external walls of the existing part two-storey, part single-storey, terraced dwelling, the installation of solar panels to the southern and western roofs of the principal structure, the installation of an air source heat pump to the private amenity space to the south of the dwelling, the demolition of the existing front porch, the modification of external opes to the southern and western elevations, the replacement of all windows and external doors, the provision of a 1.8m tall timber fence to the southern and south-western boundary to delineate the proposed private amenity space and internal alterations and all associated site and drainage works.
PERMISSION & RETENTION: 1) Permission to change from a first floor apartment and studio and ground floor apartment and studio to a single dwelling 2) Retention Permission for the ground floor extension to the rear and extension of the back wall of the existing stairwell at ground and first floor 3) Retention Permission for the first floor rear extension 4) Permission for the part demolition of the existing first floor rear extension 5) Permission to lower window sills of two no. existing ground floor windows to front 6) Permission for all associated site works and drainage.
Permission for two Portakabins - in continuation of temporary planning permission granted (3837/17).
The brief summarizes the pattern across all 13,798 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 5364/22The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief