Free preview / €49 incl. VAT full PDF

Planning precedent report

Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.
See sample PDF
Opens secure checkout for the €49 incl. VAT full PDF report.Have a code? Enter it at checkout.
€49 incl. VAT once-off PDF, no account required
Refund requests are reviewed under the published refund policy
Derived from public planning records and linked source documents
PlanIntelPlanning precedent preview

Planning precedent report

Spar Retail Unit, Retail Unit A, Building R, Spencer Dock, Mayor Street Upper, Dublin 1

One-off house / within 5 km where a location match is available

Preview

Local planning pattern

12% of nearby decided applications were refused. The preview found 12,471 nearby planning records within 5 km where a location match is available.

Matched source
DSDZ2140/20
Project type
One-off house
Coverage
5 km radius
12,471Nearby applications
12%Refused
10,927Conditional grants
3Refusal reasons

Top refusal reasons nearby

Design1
Procedure Invalid1
Residential Amenity1

Nearest similar decisions

DSDZ2140/20

Planning permission sought for provision of off-licence (8sqm), subsidiary to the main retail use. The application relates to a proposed development within an SDZ Planning Scheme Area.

Granted0.0 km16 March 2020
DSDZ3123/21

Permission for development at a c.0.0672 ha site, at Retail Units A & B, Building R, Spencer Dock, Mayor Street Upper, Dublin 1. The development will consist of the following: (i) The amalgamation of retail units A and B to provide a single retail unit with a total gross floor area of c. 629 sqm; (ii) the provision of ancillary off-licence areas of 29 sqm; (iii) the provision of associated internal (behind glazing) signage to the southern and western elevations comprising individually mounted internally illuminated letters; information signage; and an over door sign at the customer entrance on the southern elevation; (iv) minor works including a new glazed door, fixed screen and louvres to the western elevation; louvres to the southern elevation; frosted vinyl coverings and manifestations to glazing on the northern, southern and western elevations; and an internal roller shutter at the customer entrance; (v) associated plant area to be provided at basement level; and (vi) all ancillary site services and site development works. The application relates to a proposed development within a SDZ Planning Scheme Area.

Granted0.0 km02 September 2021
DSDZ3170/23

PERMISSION: The development will consist of the following: i) permission for the replacement and relocation of 2 no. existing signs on the southern and western elevations, from internal (behind glazing) signage to externally fixed signs on the existing fascia comprising of illuminated individual letters (1.59sq.m each); ii) permission for 1 no. new external sign on the southern elevation comprising of illuminated individual letters (1.59sq.m); iii) permission for a projection sign on the southern elevation (0.52sq.m); iv) permission for the relocation of the existing information sign on the southern elevation from internal face of glazing to external face of glazing (1.13sq.m) and; v) all ancillary site services and site development works. The application relates to a proposed development within a SDZ Planning Scheme Area.

Granted0.0 km30 March 2023
WEBDSDZ1019/24

The proposed development will consist of the installation of externally illuminated signage to the National College of Ireland campus building at Spencer Dock (previously granted planning permission under Reg. Ref. DSDZ5107/22). The development involves the installation of 2 no. externally illuminated signs to the corner of the south and west elevation of Building R at Level 5 and 1 no. externally illuminated sign to the southern elevation directly above the entrance to the building. The total area for the proposed signage is c. 22 sq. m. No other external alterations are proposed to the building under this planning application. This application relates to a proposed development within the North Lotts & Grand Canal Dock Strategic Development Zone Planning Scheme Area.

Granted0.0 km04 March 2024
DSDZ5107/22

Planning permission for development at this site (0.1244 ha) Building R, Spencer Dock, Mayor Street Upper, Dublin 1. The development will consist of the change of use of part of the building from office use to education use (GFA: 7,446sq.m) described on a level by level basis as follows: Ground Floor: Reception and associated facilities including toilets, welfare room, first aid room, showers / lockers, First Floor: 2no. classrooms, breakout space, ancillary offices, interview rooms, meeting room, training room, print area, tea station and ancillary accommodation, Second Floor: 2no. classrooms, breakout space, ancillary offices, meeting rooms, print area, tea station and ancillary accommodation, Third Floor: 2no. classrooms, breakout space, ancillary offices, meeting rooms, print area, tea station, and ancillary accommodation, Fourth Floor: Library, ancillary offices, meeting rooms and study spaces, Fifth Floor: Library, ancillary offices, study spaces, tea station, print room and ancillary accommodation, Sixth Floor: Canteen with associated kitchen area, and meeting rooms. The building will be served by existing access, stair and lift cores and circulation space. The ground floor retail unit occupied by Tesco will remain unchanged by this permission. Car parking (18no. spaces) and cycle parking (188no. spaces) to serve the development are located within the existing basement car park. No external alterations to the building are proposed under this planning application. Planning permission is also sought for all ancillary site services and site development works. The application relates to a proposed development within the North Lotts and Grand Canal Dock SDZ Planning Scheme Area.

Granted0.0 km13 December 2022
DSDZ4605/19

The application relates to a development within a Strategic Development Zone Planning Scheme area. The proposed development comprises of: Change of use to cafe/restaurant (70m2); Relocation of existing entrance door on the western elevation and provision of new entrance door to the southern elevation. Provision of new curtain walling system facade to the south and west elevations. Provision of fascia signage area to match new curtain walling system to the western elevation and the provision of window openings to the southern elevation and all other ancillary site development works necessary to facilitate the development.

Granted0.1 km05 February 2020

The full report covers all 12,471 decisions within 5km — with the planner's exact reasons, verbatim quotes and policy citations — delivered as a PDF. €49 incl. VAT.

The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.

Policy and design risk

Full PDF

Source document extracts

Full PDF

Comparable decision table

Full PDF

Submission strategy

Full PDF
Ready to generate the full report?€49 incl. VAT once-off PDF, no account required