Free preview / €39 incl. VAT site brief

Site planning risk brief

Fix the brief to an Eircode, a dropped pin or a drawn site boundary. PlanIntel then checks the planning register, available spatial layers, appeals and current indexed policy evidence.
See sample PDF

Define the land to check

The report your architect will ask for — here is how it compares with a €49 pre-planning report.
PlanIntel briefPlanningCheck
Price€39 incl. VAT€49
Nearby decisionsUp to 80 detailed (40 refusals + 40 grants)Not stated
AI planning chat5 messages/day freeNone
Saved-site alertsFreeNone
site bound to the north by the HSE Phoenix Care Centre; to the south by St. Brendan's Way and sports grounds; and to the west by residential properties at St. Joseph's Court and a number of industrial units fronting onto Prussia StreetOpens secure checkout for the €39 incl. VAT site risk brief. Promotion codes can be entered at checkout.
€39 incl. VAT once-off PDF, no account required
Refund requests are reviewed under the published refund policy
Derived from public planning records and linked source documents
PlanIntelSite risk brief preview

Site planning risk brief

site bound to the north by the HSE Phoenix Care Centre; to the south by St. Brendan's Way and sports grounds; and to the west by residential properties at St. Joseph's Court and a number of industrial units fronting onto Prussia Street

One-off house / within 5 km where a location match is available

Preview

Local planning pattern

13% of nearby decided applications were refused. The site check found 11,970 decisions within 5 km, 9 exact-site or onsite candidate records, and 1567 structured appeals.

Matched source
GSDZ2116/19
Project type
One-off house
Coverage
5 km radius

What this site brief can substantiate today

Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.

Applications tied to the site

Partial coverage

9 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.

9 matched

Zoning and settlement

Partial coverage

1 of 2 layers are loaded for Dublin City Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.

1 matched

Rural-housing policy

Not yet covered

No verified rural-housing citation is loaded for Dublin City Council, so this brief makes no current policy claim and relies on decision history.

Flood, heritage, ecology and archaeology

Partial coverage

2 of 4 layers are loaded for Dublin City Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.

2 matched

Access, road and wastewater prompts

Partial coverage

0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.

Structured appeal history

Confirmed coverage

1567 structured nearby appeal records.

1,567 matched

Current policy citations

Confirmed coverage

Citations are current-dated and carry policy name, section, page and source URL from the Dublin City Council development plan.

1 matched
11,970Nearby applications
9Site-linked candidates
13%Nearby refused
1,567Structured appeals

Top refusal reasons nearby

Residential Amenity3
Traffic Sightlines1

Nearest planning decisions

GSDZ3154/20

RETENTION: This site is located within the overall Grangegorman Strategic Development Zone (SDZ). The development consists of retention permission for works carried out to the Temporary Energy Centre (5 years) permitted under Dublin City Council (DCC) Reg. Ref GSDZ2116/19. The retention permission comprises: - modifications to the permitted design and layout resulting in a reduction in height from c.3.8m to c.3.6m (height of flue chimney stacks unchanged at 14m) and an increase in GFA from 220sq.m to 302sq.m.; - the use of alternative materials for the facade of the main structure; - modifications to the flue chimney stacks including an additional flue and alternative finish to the flue masts; - relocation of 2 no. external storage tanks to within the main structure; - the addition of a gas skid within a separate fenced enclosure; - modifications to the boundary fence/ access gate; - modifications to the hard landscaping and attenuation storage; and all associated development and service works on a site of 0.0889ha.

Granted0.0 km30 September 2020
GSDZ2116/19

Planning permission for development at a site located within a larger development site which is bound to the north by the HSE Phoenix Care Centre; to the south by St. Brendan's Way and sports grounds; and to the west by residential properties at St. Joseph's Court and a number of industrial units fronting onto Prussia Street. The site is located within the overall Grangegorman Strategic Development Zone (SDZ). The temporary development will consist of an energy centre facility with a cedar clad finish, measuring a total of 220 sq.m. and c.3.8m in height, with flues of c.14m; a temporary access that will facilitate deliveries and maintenance vehicles; a boundary fence around the units; and all ancillary and associated development works; all on a site of c. 0.55ha.

Granted0.0 km20 March 2019
WEB1860/20

The development will consist of a dormer roof extension to the rear of the existing two storey, terraced house and all associated works

Granted0.0 km25 January 2021
GSDZ4210/24

PROTECTED STRUCTURE: Grangegorman Development Agency intends to apply for permission for development at this site within the TU Dublin Grangegorman Campus, Grangegorman Lower, Dublin 7, located to the rear of nos. 23 and 24 Prussia Street Stoneybatter, Dublin 7, DO7 FW30. The site is located within the Grangegorman Strategic Development Zone. The development will consist of: the demolition of a section of the Grangegorman Strategic Development Zone boundary wall (a protected structure, RPS ref. 1674) and remedial works, including the provision of new entrance pillars, and the provision of utilities connections to the existing network within the Grangegorman Strategic Development Zone to facilitate the provision of a temporary construction traffic haul route alongside a temporary pedestrian and bicycle link between the Grangegorman Strategic Development Zone site and Prussia Street via the adjoining site at nos. 23 and 24 Prussia Street. This temporary link will include 2.5m high manually operated steel security gates at either end and a 2.0m high paladin mesh fence to segregate the temporary haul route from the temporary pedestrian and bicycle link. A separate, concurrent planning application for permission has been lodged for the portion of the development that is located outside of the Strategic Development Zone and will consist of: the demolition of an existing, vacant, 2-storey dwelling at no. 23 Prussia Street (c. 75sqm) and associated remedial works to the northern gable of no. 22 Prussia Street on lands within the applicant's ownership; demolition of the ground floor façade and other remnants of the former dwelling at no. 24 Prussia Street; and general site clearance to provide a temporary construction traffic haul route alongside a temporary pedestrian and bicycle link between Prussia Street and the Grangegorman Strategic Development Zone. A permanent pedestrian and bicycle link to replace the proposed temporary construction traffic haul route and temporary pedestrian and bicycle link will be provided through the site, subject to separate planning permission.

Granted0.1 km06 August 2025
GSDZ4861/23

PROTECTED STRUCTURE: PERMISSION: For a 10-year planning permission for development at a site within the overall Grangegorman Strategic Development Zone (SDZ) of c.28.69ha at Grangegorman, Dublin 7. There are several Protected Structures within the Grangegorman SDZ. The location of the proposed development comprises of a c.0.574ha (c.5,740sq.m.) site in the northwest of the Grangegorman SDZ: north of the playing fields; south of the Phoenix Care Centre; east of the Energy Centre Phase 1; and west of the Top House or North House' (Protected Structure RPS No. 3282). The development (referred to as the 'West Quad') will consist of the construction of a 2-6 storey building over a partial basement with an overall height of c.57.525m OD and a total gross floor area of c.20,728sq.m to accommodate educational facilities. Facilities will include: lecture theatres; teaching learning / research rooms and spaces; IT labs; meeting rooms; an exam / conferring/events hall; viewing gallery; staff offices; communal spaces; a café and ancillary facilities and services (including toilets, service areas, bicycle stores, plant rooms etc.). A public walkway at ground floor level will pass through the building envelope to connect St. Brendan's Way to Ivy Avenue, Link bridges from second floor level and above will connect over this walkway. A central courtyard (c.302sq.m) will be provided at first floor level and a roof terrace will be provided at the southern end of the 2 storey element (c.523sq.m). The roof will also include lift overruns, heat pumps, PV panels and an enclosed plant area. The proposed development will also provide: 512 no. bicycle parking spaces (including 404 no. basement bicycle parking spaces); 3 no. accessible car parking spaces; landscaping; and all site services and site development works.

Granted0.1 km30 April 2024
GSDZ2088/20

Planning Permission for development at a site within the overall Grangegorman Strategic Development Zone (SDZ) of c.28.69ha at Grangegorman, Dublin 7. There are several Protected Structures within the Grangegorman SDZ, The location of the proposed development comprises a site of c.0.575ha (c.5,750sq.m) in the northwest of the Grangegorman SDZ: north of the playing fields; south of the Phoenix Care Centre; east of the Energy Centre Phase 1; and west of the 'Top House or North House' (Protected Structure - RPS No. 3282. The development will consist of amendments to the West Quad permitted under DCC Reg. Ref. GSDZ3536/19, including an increase in the GFA from 19,480sq.m to 20,665sq.m. The amendments will comprise of: (1) General adjustments and improvements to internal layout at all levels (including cores); (2) Increase in size of basement at Level -01; (3) Increase in size of north section of the building at Levels 01 through Level 05 (facilitated by a reduction in the area of the roof terrace at Level 01); (4) Amendments to the courtyard, roof terraces and bridge link areas; (5) Modifications to the facade and window arrangement on the north, north-east and south elevations; (6) General adjustments to the plant, core and PV panel layout at roof level; (7) Minor reduction to the parapet height; (8) Overall increase of bicycle parking spaces from 524 no. 532 no.: and (9) All associated site development and services works.

Granted0.1 km16 March 2020

The brief summarizes the pattern across all 11,970 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.

The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.

Exact site history and boundary checks

Site brief

Policy and mapped constraints

Site brief

Appeals and comparable decisions

Site brief

Deterministic risk prompts

Site brief
Ready to get the site risk brief?€39 incl. VAT once-off PDF, no account required