Applications tied to the site
Partial coverage8 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
8 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
10% of nearby decided applications were refused. The site check found 5,452 decisions within 5 km, 8 exact-site or onsite candidate records, and 552 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
8 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
8 matched1 of 2 layers are loaded for Dublin City Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedNo verified rural-housing citation is loaded for Dublin City Council, so this brief makes no current policy claim and relies on decision history.
2 of 4 layers are loaded for Dublin City Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
552 structured nearby appeal records.
552 matchedCitations are current-dated and carry policy name, section, page and source URL from the Dublin City Council development plan.
1 matchedOpen preview
Open preview
The development consists of removal of existing hedging and gating to front of the property and the construction of a proposed new vehicular entrance with proposed gates and brick pillars to form access for vehicular access to front garden. The works will also include landscaping and all ancillary site works to the front of the property to accommodate these works. Permission is also sought for the dishing of the pavement area to the front of the property to accommodate the new vehicular entrance to the front. The works will also consist of the paving of the garden to the front of the house and the reconfiguration of the stepped entrance to the front of the house.
A. Two storey extension to side. B. all associated site works.
Planning permission for conversion of existing attic space comprising of modification of existing roof structure, raising of existing gable c/w window, new access stairs and construction of flat roof dormer to the rear.
Attic conversion with new dormer type extension to rear roof profile, to use as study / storage area, with new vehicular access, new piers & gates, footpath dishing to proposed access and associated site works,
New vehicular access, new piers & gates, new footpath dishing to proposed access and associated site works.
Planning permission for development at this site will consist of a proposed new first floor extension to the side of the existing house. A new gable wall to the side of the existing house. A new dormer roof to the rear of the existing house roof and all ancillary works.
The brief summarizes the pattern across all 5,452 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record WEB1069/20The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief