Applications tied to the site
Partial coverage27 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
27 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
13% of nearby decided applications were refused. The site check found 14,317 decisions within 5 km, 27 exact-site or onsite candidate records, and 3368 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
27 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
27 matched1 of 2 layers are loaded for Dublin City Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedNo verified rural-housing citation is loaded for Dublin City Council, so this brief makes no current policy claim and relies on decision history.
2 of 4 layers are loaded for Dublin City Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
3368 structured nearby appeal records.
3,368 matchedCitations are current-dated and carry policy name, section, page and source URL from the Dublin City Council development plan.
1 matchedOpen preview
Open preview
• 3 no. new velux rooflights to the front roofslope of the existing house • Dormer extension to rear roofslope of existing house • All associated internal layout alterations, site, landscaping, drainage and ancillary works
The development will consist of: • Demolition of existing boiler house shed to rear • Partial demolition of the existing single storey element to the side of the main dwelling and construction of a new two storey element to the side and rear of the main dwelling including conversion of the existing garage to the side • Alterations to existing single storey extension to rear • All associated internal layout alterations, site, landscaping, drainage and ancillary works. • Alterations to the existing vehicular entrance to increase in width to 3.5M
The development will consist of: Construction of first floor over garage extension with hipped roof tied to match existing. 1no. window at first floor level to front elevation. 1no. rooflight to existing front roof façade and 2 no. rooflights to south roof façade. Proposed conversion of existing attic space to include 1no. dormer window to the rear. Internal modification and all ancillary works.
PLANNING PERMISSION For development on this site: 25 Merton Drive, Ranelagh Dublin 6. The development will consist of: An attic dormer extension to rear roof elevation, new gable window to side elevation and a velux roof light to front roof elevation. Dormer extension is for habitable bedroom accommodation.
PERMISSION The development will consist of: A single storey extension to rear and first floor extension to side of existing 2 storey semi detached dwelling.
Planning permission is sought at 10 Merton Drive, Dublin 6 D06VY97 for an attic level dormer roof extension to the rear of the existing dwelling house with amendments to elevations to include upgrade of windows and external insulation.
The brief summarizes the pattern across all 14,317 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record WEB1109/24The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief