Applications tied to the site
Partial coverage3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
13% of nearby decided applications were refused. The site check found 12,017 decisions within 5 km, 3 exact-site or onsite candidate records, and 3111 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matched1 of 2 layers are loaded for Dublin City Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedNo verified rural-housing citation is loaded for Dublin City Council, so this brief makes no current policy claim and relies on decision history.
2 of 4 layers are loaded for Dublin City Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
3111 structured nearby appeal records.
3,111 matchedCitations are current-dated and carry policy name, section, page and source URL from the Dublin City Council development plan.
1 matchedOpen preview
Open preview
The proposed development will consist of the construction of a 110 kV / MV electrical substation and will include the following elements: 1. Site clearance works including removal of: i. Existing vegetation; ii. Taxi rank and associated access road. 2. Construction of: i. a substation compound (c. 495 sq.m,); ii. a 110 kV Gas Insulated Switchgear (GIS) building (c. 265 sq.m.; c. 12m in height); that will include a basement (c. 3m deep); iii 2 no. 110 kV transformers, associated bunds and firewalls (c. 7.8 m in height); iv. All other associated and ancillary site development works including the provision of site services; temporary construction compound and drainage.
The proposed development comprises the construction of a new 10 bed Intensive Care Unit (ICU) at the western end of the hospital campus, adjacent to the existing Clinical Services building, on a c.0.2217 ha site; this connectivity is required to link into the existing ICU service and theatres. The proposed works include the construction of a new 3 storey building, to an overall height of 24.163 m ODM. Level 01 will comprise of 10 ICU bedrooms and clinical support accommodation and Level 02 will comprise of office accommodation, staff support spaces and plantroom spaces. These two floors are elevated above Level 00/ ground floor level, which comprises lift shafts, a fire evacuation stair and lobby and structural elements, creating an undercroft space for future expansion of the existing Emergency Department. Works also include a 71 sqm basement at Level -01; this basement will link into the existing Clinical Services building basement for utility services and deliveries. The project includes a connection to the stair of the existing Clinical Services building, to link the existing and new building, and amendments to the facade of the existing building where the proposed new building abuts. The total proposed new building floor area is approx. 2,047 sqm (1,881 sqm internal space & 166 sqm internal plantroom). The screened external spaces comprise of the 830 sqm undercroft expansion area at Level 00 and 20 sqm of external plant at Level 02. The development also comprises of modifications to the existing ambulance access route and arrivals area incorporating a dedicated blue light lane to the west of the proposed building and the re-configuration of the ambulance area to provide 4 no. ambulance parking set-down spaces; hard landscaping, roadways, paths, lighting and signage and all associated site works and diversions are also included.
Permission is sought for replacement of existing roof to create new two storey house with new roof, 2 storey side and rear extension, relocation of existing vehicular access, and associated site works.
The development will consist of the demolition of a small one storey return to the rear of the terraced property and its replacement with a new two-storey pitched roof extension with roof lights. General reconfiguration of interior layout and all associated site works.
Demolition of existing rear extensions and construction of new rear extension to ground floor and 5m2 extension to first floor level, internal alterations and all associated site works
Planning Permission for a temporary period of seven years for development at a c. 0.1065 ha site at St. Vincent's University Hospital, Elm Park, Dublin 4, D04 T6F4. The development consists of the construction of a single storey structure (c. 515 sqm) to the north east of the St. Vincent's University Hospital Campus, adjacent to the St. Rita's building, for a temporary period of 7 no. years to accommodate the relocation of the Human Resources/Medical Administration Department and all associated site development works and site services.
The brief summarizes the pattern across all 12,017 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record WEB1284/25The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief