Planning permission is sought for the conversion of the existing attic structure, installation of a new dormer window to rear, 2 No. new rooflights to the front and a new bathroom window to the side gable, all at 2nd floor level to the existing 2 storey dwelling and all associated works.
Planning precedent report
Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.Planning precedent report
81, Ayrfield Drive, Ayrfield, Dublin 13, D13 W8X4
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
9% of nearby decided applications were refused. The preview found 5,619 nearby planning records within 5 km where a location match is available.
- Matched source
- WEB1313/24
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
Open preview
Nearest similar decisions
Permission for change of profile of existing hipped roof to pitched roof with side dormer. To create space within the loft for playroom and storage.
New two bedroom, two storey dwelling to side of existing dwelling with single storey element to front and rear, together with single storey porch to front of existing dwelling with internal modifications and associated site works
The construction of a new four bedroom, two and a half storey dwelling with all associated site works.
Demolition of existing rear ground floor flat roofed kitchen extension. Construction of a single-storey side and rear ground floor extension to dwelling.
RETENTION: Retention permission for a change of use from a crèche to residential use and associated alterations to facilitate the proposed change of use.
The full report covers all 5,619 decisions within 5km — with the planner's exact reasons, verbatim quotes and policy citations — delivered as a PDF. €49 incl. VAT.
Source match
Matched from public planning record WEB1313/24The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.
Included in full report
Policy and design risk
Included in full report
Source document extracts
Included in full report
Comparable decision table
Included in full report