Conversion of existing attic space comprising of modification of existing roof structure, raising of existing gable c/w window, new access stairs, 2no. roof windows to the front and flat roof dormer to the rear.
Planning precedent report
Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.Planning precedent report
4, Elmfield Court, Clarehall, Dublin 13, D13 K4A0
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
9% of nearby decided applications were refused. The preview found 4,867 nearby planning records within 5 km where a location match is available.
- Matched source
- WEB1317/26
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
Open preview
Nearest similar decisions
Planning permission for an attic conversion into non habitable storage space with Dormer to rear roof, roof windows to front roof, gable window to side all with associated ancillary works
The development will consist of a single storey side/rear extension and internal alterations and all associated site works.
A single storey pitched roof extension to front of existing house.
The proposed works include alterations to the properties existing attics roof structure to construct a dormer window to the rear roof plane to create additional attic room space for a home office and storage. Plus all associated site works.
Partial demolition of an existing single storey extension to side and rear, and construction of a new stepped flat roofed single storey extension to side and rear. All together with associated internal modifications, site and landscape works.
The full report covers all 4,867 decisions within 5km — with the planner's exact reasons, verbatim quotes and policy citations — delivered as a PDF. €49 incl. VAT.
Source match
Matched from public planning record WEB1317/26The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.
Included in full report
Policy and design risk
Included in full report
Source document extracts
Included in full report
Comparable decision table
Included in full report