PERMISSION & RETENTION: Planning permission is sought for the creation of vehicular access to front including the part removal of existing railing to the front of the property and the re landscaping of front driveway to accommodate a new paved area that will be used for parking and new electric car charging port, and retention permission is sought for the existing free standing bin store to the front of the property, and all associated site works.
Planning precedent report
Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.Planning precedent report
6, Tudor Road, Ranelagh, Dublin 6,D06 R2R6
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
12% of nearby decided applications were refused. The preview found 14,284 nearby planning records within 5 km where a location match is available.
- Matched source
- WEB1490/22
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
No reasons on record yet
Open preview
Nearest similar decisions
The development will consist of i) construction of a new single storey extension to the rear with rooflights; ii) new external wall insulation to the side and rear; iii) new windows and doors to the front and rear; iv) internal alterations to the existing house v) new widened vehicular entrance to the front, new gate to the rear and all associated landscaping and drainage works.
RETENTION: Planning Permission for the Retention of a single storey extension to the rear of No. 13 Moyne Court, Ranelagh, Dublin 6, D06 KT20
Permission for (1) Single storey extension to rear comprising kitchen, dining, living and utility space. (2) Alteration to rear elevation to include new entrance from back alley. (3) Works to facilitate above.
Planning permission is sought for the demolition of the existing first floor extension to the side of the existing house and the construction of a new first floor extension to the side of the existing house. Demolition of the existing chimney to the rear. All associated internal alterations, external alterations and site works.
Construction of a new rear dormer at attic level, new dormer will be higher than existing ridge line and associated internal works.
Source match
Matched from public planning record WEB1490/22The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.
Included in full report
Policy and design risk
Included in full report
Source document extracts
Included in full report
Comparable decision table
Included in full report